IAC Assessment: CO0542
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0542
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2004
Principal Product Miscellaneous aerospace parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 140,000
Annual Production 200,000 Pieces
Production Hrs. Annual 7,488
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,193 7,433,728 kWh $0.03
Electricity Demand $180,131 14,094 kW-months/year $12.78
Electricity Fees $192 - $ -
Natural Gas $28,304 5,381 MMBtu $5.26
TOTAL ENERGY COSTS $433,409
RECOMMENDED SAVINGS* $35,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,390
Cost:
$600
$3,960 138,500 $2,430 190 - - - - - - - - - - $3,960
138,500
kWh
$2,430
190
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,300
Cost:
$1,860
$2,300 80,500 - - - - - - - - - - - - $2,300
80,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
03: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$970
Cost:
$3,780
- - - - $970 145 - - - - - - - - -
-
kWh
-
-
kW-months/year
$970
145
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$530
Cost:
$250
- - - - - - $90 147,300 - - - - $440 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$90
147,300
Tgal
-
-
$
-
-
$
$440
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,380
Cost:
$52,440
$15,510 541,600 $9,480 742 - - - - - - $(-4,610) - - - $15,510
541,600
kWh
$9,480
742
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$(-4,610)
-
$
-
-
Tgal
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,900
Cost:
$18,630
$2,620 91,300 $1,880 147 - - - - $130 - $270 - - - $2,620
91,300
kWh
$1,880
147
kW-months/year
-
-
MMBtu
-
-
Tgal
$130
-
$
$270
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$35,470
Cost:
$77,560
$24,390 851,900 $13,790 1,079 $970 145 $90 147,300 $130 - $(-4,340) - $440 - $24,390
851,900
kWh
$13,790
1,079
kW-months/year
$970
145
MMBtu
$90
147,300
Tgal
$130
-
$
$(-4,340)
-
$
$440
-
Tgal
TOTAL IMPLEMENTED Savings:
$34,500
Cost:
$73,780
$24,390 851,900 $13,790 1,079 - - $90 147,300 $130 - $(-4,340) - $440 - $24,390
851,900
kWh
$13,790
1,079
kW-months/year
-
-
MMBtu
$90
147,300
Tgal
$130
-
$
$(-4,340)
-
$
$440
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Water Consumption