IAC Assessment: CO0548
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0548
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2004
Principal Product Kitchen and bath cabinets
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434 - Wood Kitchen Cabinets
Sales $5,000,000-$10,000,000
# of Employees 89
Plant Area (Sq.Ft.) 42,000
Annual Production 15,000 Pieces
Production Hrs. Annual 2,912
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,354 644,480 kWh $0.03
Electricity Demand $38,457 2,837 kW-months/year $13.56
Electricity Fees $396 - $ -
Natural Gas $22,435 3,186 MMBtu $7.04
TOTAL ENERGY COSTS $88,662
RECOMMENDED SAVINGS* $36,016 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,886
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
01: 3.8125 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER Savings:
$16,080
Cost:
$1,150
- - - - $4,210 2,013 $2,510 - - - $9,360 - -
-
kWh
-
-
kW-months/year
$4,210
2,013
gal
$2,510
-
$
-
-
$
$9,360
-
$
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$14,440
Cost:
$12,420
- - $(-270) (-20) $4,000 2,852 $(-1,440) - - - $12,150 - -
-
kWh
$(-270)
(-20)
kW-months/year
$4,000
2,852
gal
$(-1,440)
-
$
-
-
$
$12,150
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,940
Cost:
$360
$1,170 37,900 $1,770 128 - - - - - - - - $1,170
37,900
kWh
$1,770
128
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,330
Cost:
$60
$530 17,200 $800 58 - - - - - - - - $530
17,200
kWh
$800
58
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$130
Cost:
$340
$50 1,700 $80 6 - - - - - - - - $50
1,700
kWh
$80
6
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$960
Cost:
$500
- - - - - - - - $960 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$960
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$136
Cost:
$70
$55 1,840 $99 7 - - - - - - $(-18) - $55
1,840
kWh
$99
7
kW-months/year
-
-
gal
-
-
$
-
-
$
$(-18)
-
$
TOTAL RECOMMENDED Savings:
$36,016
Cost:
$14,900
$1,805 58,640 $2,479 179 $8,210 4,865 $1,070 - $960 - $21,492 - $1,805
58,640
kWh
$2,479
179
kW-months/year
$8,210
4,865
gal
$1,070
-
$
$960
-
$
$21,492
-
$
TOTAL IMPLEMENTED Savings:
$35,886
Cost:
$14,560
$1,755 56,940 $2,399 173 $8,210 4,865 $1,070 - $960 - $21,492 - $1,755
56,940
kWh
$2,399
173
kW-months/year
$8,210
4,865
gal
$1,070
-
$
$960
-
$
$21,492
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost