IAC logo
IAC Assessment: CO0553
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0553
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2004
Principal Product Custom industrial pumps, shafts
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $100,000,000-$500,000,000
# of Employees 40
Plant Area (Sq.Ft.) 45,800
Annual Production 420 Pieces
Production Hrs. Annual 4,992
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,501 1,385,004 kWh $0.06
Electricity Demand $6,168 4,458 kW-months/year $1.38
Electricity Fees $29,777 - $ -
Natural Gas $16,056 2,166 MMBtu $7.41
TOTAL ENERGY COSTS $132,502
RECOMMENDED SAVINGS* $26,600 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,980
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,190
Cost:
$20,000
$4,250 58,100 $940 244 - - - - $4,250
58,100
kWh
$940
244
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,980
Cost:
$180
$2,650 36,100 $330 87 - - - - $2,650
36,100
kWh
$330
87
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,260
Cost:
$3,020
- - - - $2,260 310 - - -
-
kWh
-
-
kW-months/year
$2,260
310
MMBtu
-
-
$
04: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$2,260
Cost:
$8,700
$1,730 23,600 $530 137 - - - - $1,730
23,600
kWh
$530
137
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,930
Cost:
$20,520
$8,850 120,800 $1,110 290 - - $(-1,030) - $8,850
120,800
kWh
$1,110
290
kW-months/year
-
-
MMBtu
$(-1,030)
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,620
Cost:
$15,230
$(-680) (-11,600) $(-60) (-16) $5,360 736 - - $(-680)
(-11,600)
kWh
$(-60)
(-16)
kW-months/year
$5,360
736
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$360
Cost:
$520
$300 3,300 - - $60 8 - - $300
3,300
kWh
-
-
kW-months/year
$60
8
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$26,600
Cost:
$68,170
$17,100 230,300 $2,850 742 $7,680 1,054 $(-1,030) - $17,100
230,300
kWh
$2,850
742
kW-months/year
$7,680
1,054
MMBtu
$(-1,030)
-
$
TOTAL IMPLEMENTED Savings:
$2,980
Cost:
$180
$2,650 36,100 $330 87 - - - - $2,650
36,100
kWh
$330
87
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost