Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2004 |
Principal Product | Architectural millwork and fixtures |
NAICS | 337215 - Showcase, Partition, Shelving, and Locker Manufacturing |
SIC | 2426 - Hardwood Dimension & Flooring Mills |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 86,700 |
Annual Production | 195 Pieces |
Production Hrs. Annual | 2,860 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $30,787 | 905,520 | kWh | $0.03 |
Electricity Demand | $49,016 | 3,909 | kW-months/year | $12.54 |
Electricity Fees | $480 | - | $ | - |
Natural Gas | $16,754 | 1,988 | MMBtu | $8.43 |
TOTAL ENERGY COSTS | $97,037 | |||
RECOMMENDED SAVINGS* | $24,750 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,890 Cost: $4,100 |
- | - | - | - | $2,890 | 349 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,890 349 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,380 Cost: $270 |
$460 | 12,700 | $920 | 69 | - | - | - | - | - | - |
$460 12,700 kWh |
$920 69 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $700 Cost: $2,760 |
$230 | 6,500 | $470 | 35 | - | - | - | - | - | - |
$230 6,500 kWh |
$470 35 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING |
Savings: $240 Cost: $480 |
$80 | 2,200 | $160 | 12 | - | - | - | - | - | - |
$80 2,200 kWh |
$160 12 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7145 INSTALL SKYLIGHTS |
Savings: $10,440 Cost: $90,000 |
$3,890 | 107,600 | $6,020 | 452 | - | - | $200 | - | $330 | - |
$3,890 107,600 kWh |
$6,020 452 kW-months/year |
- - MMBtu |
$200 - $ |
$330 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,460 Cost: $29,920 |
$2,590 | 71,800 | $4,120 | 309 | - | - | $680 | - | $1,070 | - |
$2,590 71,800 kWh |
$4,120 309 kW-months/year |
- - MMBtu |
$680 - $ |
$1,070 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $640 Cost: $960 |
$560 | 15,600 | - | - | - | - | $30 | - | $50 | - |
$560 15,600 kWh |
- - kW-months/year |
- - MMBtu |
$30 - $ |
$50 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,750 Cost: $128,490 |
$7,810 | 216,400 | $11,690 | 877 | $2,890 | 349 | $910 | - | $1,450 | - | $7,810 216,400 kWh |
$11,690 877 kW-months/year |
$2,890 349 MMBtu |
$910 - $ |
$1,450 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |