IAC logo
IAC Assessment: CO0561
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0561
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2004
Principal Product Architectural millwork and fixtures
NAICS 337215 - Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 86,700
Annual Production 195 Pieces
Production Hrs. Annual 2,860
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,787 905,520 kWh $0.03
Electricity Demand $49,016 3,909 kW-months/year $12.54
Electricity Fees $480 - $ -
Natural Gas $16,754 1,988 MMBtu $8.43
TOTAL ENERGY COSTS $97,037
RECOMMENDED SAVINGS* $24,750 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,890
Cost:
$4,100
- - - - $2,890 349 - - - - -
-
kWh
-
-
kW-months/year
$2,890
349
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,380
Cost:
$270
$460 12,700 $920 69 - - - - - - $460
12,700
kWh
$920
69
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$700
Cost:
$2,760
$230 6,500 $470 35 - - - - - - $230
6,500
kWh
$470
35
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING Savings:
$240
Cost:
$480
$80 2,200 $160 12 - - - - - - $80
2,200
kWh
$160
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7145 INSTALL SKYLIGHTS Savings:
$10,440
Cost:
$90,000
$3,890 107,600 $6,020 452 - - $200 - $330 - $3,890
107,600
kWh
$6,020
452
kW-months/year
-
-
MMBtu
$200
-
$
$330
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,460
Cost:
$29,920
$2,590 71,800 $4,120 309 - - $680 - $1,070 - $2,590
71,800
kWh
$4,120
309
kW-months/year
-
-
MMBtu
$680
-
$
$1,070
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$640
Cost:
$960
$560 15,600 - - - - $30 - $50 - $560
15,600
kWh
-
-
kW-months/year
-
-
MMBtu
$30
-
$
$50
-
$
TOTAL RECOMMENDED Savings:
$24,750
Cost:
$128,490
$7,810 216,400 $11,690 877 $2,890 349 $910 - $1,450 - $7,810
216,400
kWh
$11,690
877
kW-months/year
$2,890
349
MMBtu
$910
-
$
$1,450
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost