Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2005 |
Principal Product | Pharmaceuticals |
NAICS | 325411 - Medicinal and Botanical Manufacturing |
SIC | 2833 - Medicinals And Botanicals |
Sales | n/a |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 358,400 |
Annual Production | 999,999,999 Pieces |
Production Hrs. Annual | 7,488 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $570,981 | 16,846,011 | kWh | $0.03 |
Electricity Demand | $456,732 | 31,975 | kW-months/year | $14.28 |
Electricity Fees | $816 | - | $ | - |
Natural Gas | $442,511 | 64,618 | MMBtu | $6.85 |
TOTAL ENERGY COSTS | $1,528,202 | |||
RECOMMENDED SAVINGS* | $85,370 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $25,370 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $22,680 Cost: $3,500 |
- | - | - | - | $22,680 | 3,350 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$22,680 3,350 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $14,470 Cost: $1,000 |
$9,090 | 261,400 | $5,380 | 358 | - | - | - | - | - | - | - | - | - | - |
$9,090 261,400 kWh |
$5,380 358 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $8,940 Cost: $108,000 |
- | - | - | - | $8,940 | 1,320 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,940 1,320 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $4,930 Cost: $7,590 |
$3,100 | 88,900 | $1,830 | 122 | - | - | - | - | - | - | - | - | - | - |
$3,100 88,900 kWh |
$1,830 122 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $2,040 Cost: $1,980 |
- | - | - | - | - | - | $1,120 | 366,100 | - | - | - | - | $920 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,120 366,100 Tgal |
- - $ |
- - $ |
$920 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.9111 USE SOLAR HEAT TO HEAT MAKE-UP AIR |
Savings: $17,660 Cost: $106,080 |
- | - | - | - | $17,660 | 2,608 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$17,660 2,608 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7145 INSTALL SKYLIGHTS |
Savings: $9,370 Cost: $56,000 |
$3,980 | 114,400 | $4,820 | 321 | - | - | - | - | $200 | - | $370 | - | - | - |
$3,980 114,400 kWh |
$4,820 321 kW-months/year |
- - MMBtu |
- - Tgal |
$200 - $ |
$370 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,770 Cost: $3,520 |
$420 | 12,000 | $240 | 16 | - | - | - | - | $660 | - | $450 | - | - | - |
$420 12,000 kWh |
$240 16 kW-months/year |
- - MMBtu |
- - Tgal |
$660 - $ |
$450 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,600 Cost: $1,980 |
$750 | 21,700 | - | - | $850 | 125 | - | - | - | - | - | - | - | - |
$750 21,700 kWh |
- - kW-months/year |
$850 125 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,350 Cost: $5,400 |
$400 | 11,500 | $840 | 56 | - | - | - | - | $40 | - | $70 | - | - | - |
$400 11,500 kWh |
$840 56 kW-months/year |
- - MMBtu |
- - Tgal |
$40 - $ |
$70 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $560 Cost: $710 |
$490 | 14,200 | - | - | - | - | - | - | - | - | $70 | - | - | - |
$490 14,200 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
$70 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $85,370 Cost: $295,760 |
$18,230 | 524,100 | $13,110 | 873 | $50,130 | 7,403 | $1,120 | 366,100 | $900 | - | $960 | - | $920 | - | $18,230 524,100 kWh |
$13,110 873 kW-months/year |
$50,130 7,403 MMBtu |
$1,120 366,100 Tgal |
$900 - $ |
$960 - $ |
$920 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $25,370 Cost: $16,780 |
$13,850 | 398,200 | $7,450 | 496 | $850 | 125 | $1,120 | 366,100 | $660 | - | $520 | - | $920 | - | $13,850 398,200 kWh |
$7,450 496 kW-months/year |
$850 125 MMBtu |
$1,120 366,100 Tgal |
$660 - $ |
$520 - $ |
$920 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption |