IAC logo
IAC Assessment: CO0572
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0572
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2005
Principal Product Aircraft
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 400
Plant Area (Sq.Ft.) 90,000
Annual Production 7 Pieces
Production Hrs. Annual 6,916
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,357 1,752,960 kWh $0.07
Electricity Demand $11,817 3,540 kW-months/year $3.34
Electricity Fees $2,392 - $ -
Natural Gas $6,747 775 MMBtu $8.71
TOTAL ENERGY COSTS $136,313
RECOMMENDED SAVINGS* $19,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$9,660
Cost:
$40,800
$7,150 175,500 $1,530 367 - - $870 - $110 - $7,150
175,500
kWh
$1,530
367
kW-months/year
-
-
MMBtu
$870
-
$
$110
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,460
Cost:
$7,700
$2,790 68,500 $390 94 - - $140 - $140 - $2,790
68,500
kWh
$390
94
kW-months/year
-
-
MMBtu
$140
-
$
$140
-
$
03: 2.9111 USE SOLAR HEAT TO HEAT MAKE-UP AIR Savings:
$2,480
Cost:
$30,770
$(-310) (-7,600) $(-80) (-18) $2,870 357 - - - - $(-310)
(-7,600)
kWh
$(-80)
(-18)
kW-months/year
$2,870
357
MMBtu
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,420
Cost:
$7,570
$1,640 40,200 - - - - $80 - $700 - $1,640
40,200
kWh
-
-
kW-months/year
-
-
MMBtu
$80
-
$
$700
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,370
Cost:
$1,000
$(-200) (-4,900) $(-30) (-7) $1,600 199 - - - - $(-200)
(-4,900)
kWh
$(-30)
(-7)
kW-months/year
$1,600
199
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$560
Cost:
$1,760
$560 13,800 - - - - - - - - $560
13,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,950
Cost:
$89,600
$11,630 285,500 $1,810 436 $4,470 556 $1,090 - $950 - $11,630
285,500
kWh
$1,810
436
kW-months/year
$4,470
556
MMBtu
$1,090
-
$
$950
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost