IAC logo
IAC Assessment: CO0584
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0584
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2006
Principal Product Robotic welders
NAICS 333992 - Welding and Soldering Equipment Manufacturing
SIC 3548 - Welding Apparatus
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 107,250
Annual Production 50 Pieces
Production Hrs. Annual 3,120
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,624 2,455,200 kWh $0.02
Electricity Demand $74,699 8,691 kW-months/year $8.59
Electricity Fees $324 - $ -
Natural Gas $10,231 9,495 MMBtu $1.08
TOTAL ENERGY COSTS $131,878
RECOMMENDED SAVINGS* $24,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,220
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$210
Cost:
-
$210 10,800 - - - - - - - - $210
10,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,220
Cost:
$31,750
$4,490 236,100 $11,010 1,263 - - $440 - $280 - $4,490
236,100
kWh
$11,010
1,263
kW-months/year
-
-
MMBtu
$440
-
$
$280
-
$
03: 2.9111 USE SOLAR HEAT TO HEAT MAKE-UP AIR Savings:
$3,480
Cost:
$21,810
- - - - $3,480 369 - - - - -
-
kWh
-
-
kW-months/year
$3,480
369
MMBtu
-
-
$
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,130
Cost:
$16,160
- - - - $2,130 226 - - - - -
-
kWh
-
-
kW-months/year
$2,130
226
MMBtu
-
-
$
-
-
$
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,500
Cost:
$2,950
$270 14,100 $1,230 170 - - - - - - $270
14,100
kWh
$1,230
170
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$820
Cost:
$740
$80 4,100 $110 12 - - $140 - $490 - $80
4,100
kWh
$110
12
kW-months/year
-
-
MMBtu
$140
-
$
$490
-
$
TOTAL RECOMMENDED Savings:
$24,360
Cost:
$73,410
$5,050 265,100 $12,350 1,445 $5,610 595 $580 - $770 - $5,050
265,100
kWh
$12,350
1,445
kW-months/year
$5,610
595
MMBtu
$580
-
$
$770
-
$
TOTAL IMPLEMENTED Savings:
$16,220
Cost:
$31,750
$4,490 236,100 $11,010 1,263 - - $440 - $280 - $4,490
236,100
kWh
$11,010
1,263
kW-months/year
-
-
MMBtu
$440
-
$
$280
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost