IAC Assessment: CO0607
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0607
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2007
Principal Product Hardwood molding and millwork
NAICS 321918 - Other Millwork (including Flooring)
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 36,000
Annual Production 3,500,000 Thousand Feet
Production Hrs. Annual 2,275
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,838 537,600 kWh $0.03
Electricity Demand $41,854 2,830 kW-months/year $14.79
Electricity Fees $337 - $ -
Natural Gas $26,133 33,370 MMBtu $0.78
Fuel Oil #2 $63,870 3,134 MMBtu $20.38
TOTAL ENERGY COSTS $149,032
RECOMMENDED SAVINGS* $18,040 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,830
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$8,830
Cost:
$10,000
- - - - $8,830 1,250 - - - - - - -
-
kWh
-
-
kW-months/year
$8,830
1,250
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$3,780
Cost:
-
- - - - - - $3,780 157 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,780
157
MMBtu
-
-
$
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,590
Cost:
$10,010
$(-250) (-8,000) $(-170) (-11) $3,010 427 - - - - - - $(-250)
(-8,000)
kWh
$(-170)
(-11)
kW-months/year
$3,010
427
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,650
Cost:
$11,000
$450 14,600 $1,200 77 - - - - - - - - $450
14,600
kWh
$1,200
77
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$610
Cost:
$3,710
$170 5,600 $410 26 - - - - $10 - $20 - $170
5,600
kWh
$410
26
kW-months/year
-
-
MMBtu
-
-
MMBtu
$10
-
$
$20
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$580
Cost:
$1,710
$220 7,200 $340 22 - - - - $20 - - - $220
7,200
kWh
$340
22
kW-months/year
-
-
MMBtu
-
-
MMBtu
$20
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$18,040
Cost:
$36,430
$590 19,400 $1,780 114 $11,840 1,677 $3,780 157 $30 - $20 - $590
19,400
kWh
$1,780
114
kW-months/year
$11,840
1,677
MMBtu
$3,780
157
MMBtu
$30
-
$
$20
-
$
TOTAL IMPLEMENTED Savings:
$8,830
Cost:
$10,000
- - - - $8,830 1,250 - - - - - - -
-
kWh
-
-
kW-months/year
$8,830
1,250
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Ancillary Material Cost