IAC logo
IAC Assessment: CO0651
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0651
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2011
Principal Product Fabric tension structures
NAICS 314910 - Textile Bag and Canvas Mills
SIC 2394 - Canvas And Related Products
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 76,000
Annual Production 1,000 Pieces
Production Hrs. Annual 2,871
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,908 587,440 kWh $0.07
Electricity Demand $27,670 3,278 kW-months/year $8.44
Electricity Fees $4,236 - $ -
Natural Gas $43,931 4,591 MMBtu $9.57
TOTAL ENERGY COSTS $114,745
RECOMMENDED SAVINGS* $32,080 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$17,750
Cost:
$20,000
$1,520 66,200 $8,700 103 $1,660 - $5,870 591 - - - - $1,520
66,200
kWh
$8,700
103
kW-months/year
$1,660
-
$
$5,870
591
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,300
Cost:
$110
$740 12,000 $560 50 - - - - - - - - $740
12,000
kWh
$560
50
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,530
Cost:
$31,210
$6,380 91,400 $2,920 471 - - - - $130 - $100 - $6,380
91,400
kWh
$2,920
471
kW-months/year
-
-
$
-
-
MMBtu
$130
-
$
$100
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,470
Cost:
$20,920
$(-260) (-3,600) $(-100) (-20) - - $2,830 344 - - - - $(-260)
(-3,600)
kWh
$(-100)
(-20)
kW-months/year
-
-
$
$2,830
344
MMBtu
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,030
Cost:
$90
$570 9,300 $440 39 - - - - $20 - - - $570
9,300
kWh
$440
39
kW-months/year
-
-
$
-
-
MMBtu
$20
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,080
Cost:
$72,330
$8,950 175,300 $12,520 643 $1,660 - $8,700 935 $150 - $100 - $8,950
175,300
kWh
$12,520
643
kW-months/year
$1,660
-
$
$8,700
935
MMBtu
$150
-
$
$100
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost