Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2011
Principal Product Consumer health care products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 244,561
Annual Production 4,700,000 Pieces
Production Hrs. Annual 4,438
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,009 3,848,600 kWh $0.02
Electricity Demand $156,360 9,111 kW-months/year $17.16
Electricity Fees $828 - $ -
Natural Gas $41,693 6,289 MMBtu $6.63
TOTAL ENERGY COSTS $292,890
RECOMMENDED SAVINGS* $45,140 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,630
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,900
Cost:
$31,760
$8,250 198,200 $2,650 178 - - - - - - $8,250
198,200
kWh
$2,650
178
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,630
Cost:
$800
$1,740 41,700 $890 60 - - - - - - $1,740
41,700
kWh
$890
60
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,230
Cost:
$91,620
$14,990 360,100 $12,350 831 - - $590 - $300 - $14,990
360,100
kWh
$12,350
831
kW-months/year
-
-
MMBtu
$590
-
$
$300
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,380
Cost:
$25,810
$(-700) (-16,800) $(-240) (-16) $4,320 829 - - - - $(-700)
(-16,800)
kWh
$(-240)
(-16)
kW-months/year
$4,320
829
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$45,140
Cost:
$149,990
$24,280 583,200 $15,650 1,053 $4,320 829 $590 - $300 - $24,280
583,200
kWh
$15,650
1,053
kW-months/year
$4,320
829
MMBtu
$590
-
$
$300
-
$
TOTAL IMPLEMENTED Savings:
$2,630
Cost:
$800
$1,740 41,700 $890 60 - - - - - - $1,740
41,700
kWh
$890
60
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost