Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2012
Principal Product Prestressed concrete panels
NAICS 327390 - Other Concrete Product Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 10,000
Annual Production 45,600 Pieces
Production Hrs. Annual 5,766
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,787 1,547,326 kWh $0.04
Electricity Demand $84,222 4,766 kW-months/year $17.67
Electricity Fees $4,461 - $ -
Natural Gas $197,378 39,059 MMBtu $5.05
TOTAL ENERGY COSTS $342,848
RECOMMENDED SAVINGS* $17,650 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,650
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,050
Cost:
$1,440
- - - - $8,050 1,623 - - - - -
-
kWh
-
-
kW-months/year
$8,050
1,623
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,130
Cost:
$1,990
$1,310 39,100 $820 47 - - - - - - $1,310
39,100
kWh
$820
47
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$570
Cost:
$820
$210 6,200 $360 21 - - - - - - $210
6,200
kWh
$360
21
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,900
Cost:
$17,990
$3,080 92,300 $3,580 206 - - $150 - $90 - $3,080
92,300
kWh
$3,580
206
kW-months/year
-
-
MMBtu
$150
-
$
$90
-
$
TOTAL RECOMMENDED Savings:
$17,650
Cost:
$22,240
$4,600 137,600 $4,760 274 $8,050 1,623 $150 - $90 - $4,600
137,600
kWh
$4,760
274
kW-months/year
$8,050
1,623
MMBtu
$150
-
$
$90
-
$
TOTAL IMPLEMENTED Savings:
$17,650
Cost:
$22,240
$4,600 137,600 $4,760 274 $8,050 1,623 $150 - $90 - $4,600
137,600
kWh
$4,760
274
kW-months/year
$8,050
1,623
MMBtu
$150
-
$
$90
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost