IAC Assessment: CO0655
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0655
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2012
Principal Product Plastic injection molded parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 44,800
Annual Production 585,000 Pieces
Production Hrs. Annual 6,266
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,611 1,305,036 kWh $0.05
Electricity Demand $63,772 3,442 kW-months/year $18.53
Electricity Fees $844 - $ -
Natural Gas $4,137 499 MMBtu $8.29
TOTAL ENERGY COSTS $132,364
RECOMMENDED SAVINGS* $17,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,710
Cost:
$67,190
$5,910 127,700 $4,800 255 - - - - - - - - $5,910
127,700
kWh
$4,800
255
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$590
Cost:
$1,930
$570 12,200 $320 17 $(-300) (-44) - - - - - - $570
12,200
kWh
$320
17
kW-months/year
$(-300)
(-44)
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,640
Cost:
$21,170
$2,270 44,600 $1,400 74 - - $130 - - - $(-160) - $2,270
44,600
kWh
$1,400
74
kW-months/year
-
-
MMBtu
$130
-
$
-
-
$
$(-160)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,070
Cost:
$6,090
$970 14,100 - - - - $50 - - - $50 - $970
14,100
kWh
-
-
kW-months/year
-
-
MMBtu
$50
-
$
-
-
$
$50
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$990
Cost:
$2,070
$510 8,700 $420 23 - - - - $20 - $40 - $510
8,700
kWh
$420
23
kW-months/year
-
-
MMBtu
-
-
$
$20
-
$
$40
-
$
TOTAL RECOMMENDED Savings:
$17,000
Cost:
$98,450
$10,230 207,300 $6,940 369 $(-300) (-44) $180 - $20 - $(-70) - $10,230
207,300
kWh
$6,940
369
kW-months/year
$(-300)
(-44)
MMBtu
$180
-
$
$20
-
$
$(-70)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost