IAC Assessment: CO0659
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0659
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2012
Principal Product Precision Sheet Metal Fabrication
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 43,200
Annual Production 6,500 Pieces
Production Hrs. Annual 2,741
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,100 851,100 kWh $0.05
Electricity Demand $57,171 2,816 kW-months/year $20.30
Electricity Fees $1,279 - $ -
Natural Gas $10,425 1,534 MMBtu $6.80
TOTAL ENERGY COSTS $113,975
RECOMMENDED SAVINGS* $34,810 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,720
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,680
Cost:
$25,960
$2,970 48,800 $2,710 127 - - - - - - - - $2,970
48,800
kWh
$2,710
127
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,470
Cost:
$500
$990 16,300 $480 23 - - - - - - - - $990
16,300
kWh
$480
23
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$21,530
Cost:
$6,400
$5,830 95,700 $15,700 735 - - - - - - - - $5,830
95,700
kWh
$15,700
735
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,180
Cost:
$500
- - - - - - - - $3,180 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,180
-
$
-
-
$
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$2,570
Cost:
-
$820 13,400 $360 17 $1,390 242 - - - - - - $820
13,400
kWh
$360
17
kW-months/year
$1,390
242
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$380
Cost:
$1,240
$310 5,100 - - - - $40 - - - $30 - $310
5,100
kWh
-
-
kW-months/year
-
-
MMBtu
$40
-
$
-
-
$
$30
-
$
TOTAL RECOMMENDED Savings:
$34,810
Cost:
$34,600
$10,920 179,300 $19,250 902 $1,390 242 $40 - $3,180 - $30 - $10,920
179,300
kWh
$19,250
902
kW-months/year
$1,390
242
MMBtu
$40
-
$
$3,180
-
$
$30
-
$
TOTAL IMPLEMENTED Savings:
$9,720
Cost:
$26,460
$4,780 78,500 $3,550 167 $1,390 242 - - - - - - $4,780
78,500
kWh
$3,550
167
kW-months/year
$1,390
242
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost