IAC Assessment: CO0661
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2012
Principal Product Crushed Aggregates
NAICS 327999 - All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $500,000-$1,000,000
# of Employees 4
Plant Area (Sq.Ft.) 12,930
Annual Production 507 Units
Production Hrs. Annual 1,820
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $12,013 222,120 kWh $0.05
Electricity Demand $145,284 4,733 kW-months/year $30.70
Electricity Fees $1,408 - $ -
Fuel Oil #2 $5,044 212 MMBtu $23.79
TOTAL ENERGY COSTS $163,749
RECOMMENDED SAVINGS* $91,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,060
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$26,390
Cost:
$1,000
$1,310 24,200 $25,080 798 - - - - - - $1,310
24,200
kWh
$25,080
798
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,260
Cost:
$340
$750 13,800 $2,510 80 - - - - - - $750
13,800
kWh
$2,510
80
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,020
Cost:
$2,860
$50 900 $2,970 95 - - - - - - $50
900
kWh
$2,970
95
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$52,770
Cost:
$500
$4,290 - $50,170 - - - $(-1,690) - - - $4,290
-
kWh
$50,170
-
kW-months/year
-
-
$
$(-1,690)
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$4,410
Cost:
$500
- - - - - - $4,410 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,410
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,150
Cost:
$4,670
$190 3,600 $940 30 $10 - - - $10 - $190
3,600
kWh
$940
30
kW-months/year
$10
-
$
-
-
$
$10
-
$
TOTAL RECOMMENDED Savings:
$91,000
Cost:
$9,870
$6,590 42,500 $81,670 1,003 $10 - $2,720 - $10 - $6,590
42,500
kWh
$81,670
1,003
kW-months/year
$10
-
$
$2,720
-
$
$10
-
$
TOTAL IMPLEMENTED Savings:
$34,060
Cost:
$1,840
$2,060 38,000 $27,590 878 - - $4,410 - - - $2,060
38,000
kWh
$27,590
878
kW-months/year
-
-
$
$4,410
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost