IAC Assessment: CO0662
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0662
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2012
Principal Product Creosote Treated Railroad Ties
NAICS 321114 - Wood Preservation
SIC 2491 - Wood Preserving
Sales $10,000,000-$50,000,000
# of Employees 32
Plant Area (Sq.Ft.) 21,300
Annual Production 2,400,000 Units
Production Hrs. Annual 7,176
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,090 2,584,610 kWh $0.04
Electricity Demand $108,890 6,487 kW-months/year $16.79
Electricity Fees $3,832 - $ -
Natural Gas $275,603 42,247 MMBtu $6.52
TOTAL ENERGY COSTS $484,415
RECOMMENDED SAVINGS* $35,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,420
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,990
Cost:
$850
$2,390 68,600 $1,600 94 - - - - - - - - $2,390
68,600
kWh
$1,600
94
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,070
Cost:
$430
- - - - $3,070 464 - - - - - - -
-
kWh
-
-
kW-months/year
$3,070
464
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,930
Cost:
$3,460
$1,060 30,500 $870 51 - - - - - - - - $1,060
30,500
kWh
$870
51
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$13,030
Cost:
$500
- - - - - - - - $13,030 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$13,030
-
$
-
-
$
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$7,350
Cost:
$33,500
- - - - $7,350 1,109 - - - - - - -
-
kWh
-
-
kW-months/year
$7,350
1,109
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,330
Cost:
$8,900
$1,750 50,300 $1,490 87 - - $440 - - - $650 - $1,750
50,300
kWh
$1,490
87
kW-months/year
-
-
MMBtu
$440
-
$
-
-
$
$650
-
$
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,310
Cost:
$1,580
$1,010 33,000 $300 19 - - - - - - - - $1,010
33,000
kWh
$300
19
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$35,010
Cost:
$49,220
$6,210 182,400 $4,260 251 $10,420 1,573 $440 - $13,030 - $650 - $6,210
182,400
kWh
$4,260
251
kW-months/year
$10,420
1,573
MMBtu
$440
-
$
$13,030
-
$
$650
-
$
TOTAL IMPLEMENTED Savings:
$24,420
Cost:
$10,680
$4,140 118,900 $3,090 181 $3,070 464 $440 - $13,030 - $650 - $4,140
118,900
kWh
$3,090
181
kW-months/year
$3,070
464
MMBtu
$440
-
$
$13,030
-
$
$650
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost