Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2013
Principal Product Industrial cleaning equipment
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3589 - Service Industry Machinery, Nec
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 191,000
Annual Production 7,000 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,297 3,325,301 kWh $0.04
Electricity Demand $228,263 11,268 kW-months/year $20.26
Electricity Fees $4,799 - $ -
Natural Gas $106,216 22,178 MMBtu $4.79
TOTAL ENERGY COSTS $462,575
RECOMMENDED SAVINGS* $46,240 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,240
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,280
Cost:
$45,000
$5,590 139,800 $5,690 280 - - - - - - - - $5,590
139,800
kWh
$5,690
280
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,280
Cost:
$2,040
$2,120 53,100 $2,160 106 - - - - - - - - $2,120
53,100
kWh
$2,160
106
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,450
Cost:
$48,290
$14,690 367,800 $9,880 485 - - $600 - - - $280 - $14,690
367,800
kWh
$9,880
485
kW-months/year
-
-
$
$600
-
$
-
-
$
$280
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,280
Cost:
$500
$(-5,090) - $7,510 - $860 - - - - - - - $(-5,090)
-
kWh
$7,510
-
kW-months/year
$860
-
$
-
-
$
-
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,950
Cost:
$500
- - - - - - - - $1,950 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$1,950
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$46,240
Cost:
$96,330
$17,310 560,700 $25,240 871 $860 - $600 - $1,950 - $280 - $17,310
560,700
kWh
$25,240
871
kW-months/year
$860
-
$
$600
-
$
$1,950
-
$
$280
-
$
TOTAL IMPLEMENTED Savings:
$46,240
Cost:
$96,330
$17,310 560,700 $25,240 871 $860 - $600 - $1,950 - $280 - $17,310
560,700
kWh
$25,240
871
kW-months/year
$860
-
$
$600
-
$
$1,950
-
$
$280
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost