IAC logo
IAC Assessment: CO0670
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0670
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2013
Principal Product Fabricated sheet metal products
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 110,900
Annual Production 3,000,000 Pounds
Production Hrs. Annual 5,824
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,775 1,769,900 kWh $0.05
Electricity Demand $99,442 5,197 kW-months/year $19.13
Electricity Fees $656 - $ -
Natural Gas $80,322 11,194 MMBtu $7.18
TOTAL ENERGY COSTS $276,705
RECOMMENDED SAVINGS* $23,490 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,660
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,960
Cost:
$670
$4,010 74,300 $2,950 153 - - - - - - $4,010
74,300
kWh
$2,950
153
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,830
Cost:
$25,400
$2,300 42,500 $2,530 131 - - - - - - $2,300
42,500
kWh
$2,530
131
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,800
Cost:
$620
$590 11,000 - - $3,210 477 - - - - $590
11,000
kWh
-
-
kW-months/year
$3,210
477
MMBtu
-
-
gal
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,160
Cost:
$330
- - - - $1,160 172 - - - - -
-
kWh
-
-
kW-months/year
$1,160
172
MMBtu
-
-
gal
-
-
$
05: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$660
Cost:
-
$(-100) (-1,900) $(-70) (-4) - - $1,400 523 $(-570) - $(-100)
(-1,900)
kWh
$(-70)
(-4)
kW-months/year
-
-
MMBtu
$1,400
523
gal
$(-570)
-
$
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$6,080
Cost:
$500
- - - - - - - - $6,080 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$6,080
-
$
TOTAL RECOMMENDED Savings:
$23,490
Cost:
$27,520
$6,800 125,900 $5,410 280 $4,370 649 $1,400 523 $5,510 - $6,800
125,900
kWh
$5,410
280
kW-months/year
$4,370
649
MMBtu
$1,400
523
gal
$5,510
-
$
TOTAL IMPLEMENTED Savings:
$18,660
Cost:
$2,120
$4,500 83,400 $2,880 149 $4,370 649 $1,400 523 $5,510 - $4,500
83,400
kWh
$2,880
149
kW-months/year
$4,370
649
MMBtu
$1,400
523
gal
$5,510
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes