IAC Assessment: CO0676
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0676
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2013
Principal Product Fiberglass Light Poles
NAICS 335129 - Other Lighting Equipment Manufacturing
SIC 3648 - Lighting Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 154,250
Annual Production 12,000 Pieces
Production Hrs. Annual 2,080
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,495 751,129 kWh $0.04
Electricity Demand $56,516 2,664 kW-months/year $21.21
Electricity Fees $628 - $ -
Natural Gas $21,030 3,309 MMBtu $6.36
TOTAL ENERGY COSTS $108,669
RECOMMENDED SAVINGS* $11,450 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,780
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,670
Cost:
$2,740
$370 8,500 $2,300 106 - - - - - - - - $370
8,500
kWh
$2,300
106
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,020
Cost:
$250
$520 11,900 $1,500 69 - - - - - - - - $520
11,900
kWh
$1,500
69
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$730
Cost:
$900
- - - - $730 109 - - - - - - -
-
kWh
-
-
kW-months/year
$730
109
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,190
Cost:
$3,000
$940 21,800 $2,010 93 - - $120 - - - $120 - $940
21,800
kWh
$2,010
93
kW-months/year
-
-
MMBtu
$120
-
$
-
-
$
$120
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,840
Cost:
$500
- - - - - - - - $2,840 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,840
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$11,450
Cost:
$7,390
$1,830 42,200 $5,810 268 $730 109 $120 - $2,840 - $120 - $1,830
42,200
kWh
$5,810
268
kW-months/year
$730
109
MMBtu
$120
-
$
$2,840
-
$
$120
-
$
TOTAL IMPLEMENTED Savings:
$8,780
Cost:
$4,650
$1,460 33,700 $3,510 162 $730 109 $120 - $2,840 - $120 - $1,460
33,700
kWh
$3,510
162
kW-months/year
$730
109
MMBtu
$120
-
$
$2,840
-
$
$120
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost