IAC logo
IAC Assessment: CO0677
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0677
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2013
Principal Product Brewed beverages
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 34,000
Annual Production 130,000 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,039 1,435,776 kWh $0.03
Electricity Demand $54,806 3,599 kW-months/year $15.23
Electricity Fees $948 - $ -
Natural Gas $65,579 13,577 MMBtu $4.83
TOTAL ENERGY COSTS $169,372
RECOMMENDED SAVINGS* $12,510 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,630
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$3,450
Cost:
$14,200
$1,720 48,600 $1,730 110 - - - - - - - - $1,720
48,600
kWh
$1,730
110
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,660
Cost:
$1,620
- - - - $2,660 550 - - - - - - -
-
kWh
-
-
kW-months/year
$2,660
550
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$520
Cost:
-
$210 6,000 $310 20 - - - - - - - - $210
6,000
kWh
$310
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$430
Cost:
$2,450
$260 7,500 $170 11 - - - - - - - - $260
7,500
kWh
$170
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$4,810
Cost:
-
- - - - - - - - $4,810 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,810
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$640
Cost:
$3,450
$580 16,300 - - - - $40 - - - $20 - $580
16,300
kWh
-
-
kW-months/year
-
-
MMBtu
$40
-
$
-
-
$
$20
-
$
TOTAL RECOMMENDED Savings:
$12,510
Cost:
$21,720
$2,770 78,400 $2,210 141 $2,660 550 $40 - $4,810 - $20 - $2,770
78,400
kWh
$2,210
141
kW-months/year
$2,660
550
MMBtu
$40
-
$
$4,810
-
$
$20
-
$
TOTAL IMPLEMENTED Savings:
$8,630
Cost:
$5,070
$790 22,300 $310 20 $2,660 550 $40 - $4,810 - $20 - $790
22,300
kWh
$310
20
kW-months/year
$2,660
550
MMBtu
$40
-
$
$4,810
-
$
$20
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost