IAC logo
IAC Assessment: CO0678
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0678
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2013
Principal Product Lamb slaughtering and Processing
NAICS 311611 - Animal (except Poultry) Slaughtering
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 54,000
Annual Production 450,000 Pieces
Production Hrs. Annual 2,990
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,485 3,824,132 kWh $0.04
Electricity Demand $175,780 8,536 kW-months/year $20.59
Electricity Fees $1,849 - $ -
Natural Gas $123,711 21,865 MMBtu $5.66
TOTAL ENERGY COSTS $453,825
RECOMMENDED SAVINGS* $33,920 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,780
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$6,330
Cost:
$14,900
$2,410 57,400 $3,920 189 - - - - - - - - $2,410
57,400
kWh
$3,920
189
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,540
Cost:
$200
$1,320 31,500 $1,220 59 - - - - - - - - $1,320
31,500
kWh
$1,220
59
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,340
Cost:
$8,100
$1,380 32,900 $960 46 - - - - - - - - $1,380
32,900
kWh
$960
46
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$890
Cost:
$350
- - - - $890 158 - - - - - - -
-
kWh
-
-
kW-months/year
$890
158
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,580
Cost:
$15,680
$7,020 167,600 $5,590 270 - - $190 - - - $780 - $7,020
167,600
kWh
$5,590
270
kW-months/year
-
-
MMBtu
$190
-
$
-
-
$
$780
-
$
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$8,240
Cost:
$1,500
- - - - - - - - $8,240 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$8,240
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$33,920
Cost:
$40,730
$12,130 289,400 $11,690 564 $890 158 $190 - $8,240 - $780 - $12,130
289,400
kWh
$11,690
564
kW-months/year
$890
158
MMBtu
$190
-
$
$8,240
-
$
$780
-
$
TOTAL IMPLEMENTED Savings:
$10,780
Cost:
$1,700
$1,320 31,500 $1,220 59 - - - - $8,240 - - - $1,320
31,500
kWh
$1,220
59
kW-months/year
-
-
MMBtu
-
-
$
$8,240
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost