IAC Assessment: CO0681
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2014
Principal Product Injection molded metal parts
NAICS 332117 - Powder Metallurgy Part Manufacturing
SIC 3399 - Primary Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 105,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $527,580 9,377,777 kWh $0.06
Electricity Demand $373,794 21,160 kW-months/year $17.67
Electricity Fees $795 - $ -
Natural Gas $37,169 5,513 MMBtu $6.74
TOTAL ENERGY COSTS $939,338
RECOMMENDED SAVINGS* $189,960 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $175,400
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,480
Cost:
$13,140
$3,710 62,700 $3,770 229 - - - - $3,710
62,700
kWh
$3,770
229
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,470
Cost:
$900
$2,510 42,400 $960 58 - - - - $2,510
42,400
kWh
$960
58
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$175,400
Cost:
$229,810
$132,870 2,244,300 $38,700 2,348 $3,830 590 - - $132,870
2,244,300
kWh
$38,700
2,348
kW-months/year
$3,830
590
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,610
Cost:
$8,490
$2,430 41,000 $1,130 69 - - $50 - $2,430
41,000
kWh
$1,130
69
kW-months/year
-
-
MMBtu
$50
-
$
TOTAL RECOMMENDED Savings:
$189,960
Cost:
$252,340
$141,520 2,390,400 $44,560 2,704 $3,830 590 $50 - $141,520
2,390,400
kWh
$44,560
2,704
kW-months/year
$3,830
590
MMBtu
$50
-
$
TOTAL IMPLEMENTED Savings:
$175,400
Cost:
$229,810
$132,870 2,244,300 $38,700 2,348 $3,830 590 - - $132,870
2,244,300
kWh
$38,700
2,348
kW-months/year
$3,830
590
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes