Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2014 |
Principal Product | Optical Instruments |
NAICS | 333314 - Optical Instrument and Lens Manufacturing |
SIC | 3827 - Optical Instruments And Lenses |
Sales | $10,000,000-$50,000,000 |
# of Employees | 230 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 180,000 Pieces |
Production Hrs. Annual | 4,680 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $408,906 | 9,777,375 | kWh | $0.04 |
Electricity Demand | $364,363 | 17,640 | kW-months/year | $20.66 |
Electricity Fees | $605 | - | $ | - |
Natural Gas | $25,147 | 4,025 | MMBtu | $6.25 |
TOTAL ENERGY COSTS | $799,021 | |||
RECOMMENDED SAVINGS* | $52,680 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,080 Cost: $9,950 |
- | - | - | - | $4,080 | 558 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,080 558 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM |
Savings: $42,490 Cost: $93,580 |
$14,550 | 317,100 | $24,280 | 1,118 | $3,660 | 500 | - | - | - | - |
$14,550 317,100 kWh |
$24,280 1,118 kW-months/year |
$3,660 500 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,860 Cost: $5,750 |
$1,910 | 41,600 | $1,870 | 89 | - | - | $160 | - | $920 | - |
$1,910 41,600 kWh |
$1,870 89 kW-months/year |
- - MMBtu |
$160 - $ |
$920 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,250 Cost: $1,240 |
$1,040 | 22,600 | - | - | - | - | $30 | - | $180 | - |
$1,040 22,600 kWh |
- - kW-months/year |
- - MMBtu |
$30 - $ |
$180 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $52,680 Cost: $110,520 |
$17,500 | 381,300 | $26,150 | 1,207 | $7,740 | 1,058 | $190 | - | $1,100 | - | $17,500 381,300 kWh |
$26,150 1,207 kW-months/year |
$7,740 1,058 MMBtu |
$190 - $ |
$1,100 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |