IAC logo
IAC Assessment: CO0683
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0683
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2014
Principal Product Data Storage Tape Decks
NAICS 334112 - Computer Storage Device Manufacturing
SIC 3572 - Computer Storage Devices
Sales $100,000,000-$500,000,000
# of Employees 370
Plant Area (Sq.Ft.) 84,400
Annual Production 2,000 Pieces
Production Hrs. Annual 3,619
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,618 3,463,019 kWh $0.04
Electricity Demand $150,440 6,930 kW-months/year $21.71
Electricity Fees $1,266 - $ -
Natural Gas $9,597 1,281 MMBtu $7.49
TOTAL ENERGY COSTS $314,921
RECOMMENDED SAVINGS* $40,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,540
Cost:
$21,440
$6,450 134,700 $8,240 373 $290 - $1,560 - $6,450
134,700
kWh
$8,240
373
kW-months/year
$290
-
$
$1,560
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,750
Cost:
$13,140
$7,870 164,400 $4,880 230 - - - - $7,870
164,400
kWh
$4,880
230
kW-months/year
-
-
$
-
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$8,270
Cost:
-
$4,770 99,600 $3,500 155 - - - - $4,770
99,600
kWh
$3,500
155
kW-months/year
-
-
$
-
-
$
04: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$2,440
Cost:
$6,450
$1,890 39,500 $550 27 - - - - $1,890
39,500
kWh
$550
27
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$40,000
Cost:
$41,030
$20,980 438,200 $17,170 785 $290 - $1,560 - $20,980
438,200
kWh
$17,170
785
kW-months/year
$290
-
$
$1,560
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost