IAC logo
IAC Assessment: CO0701
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0701
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2015
Principal Product Roofing Asphalt
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 12
Plant Area (Sq.Ft.) 43,560
Annual Production 400,000 Pounds
Production Hrs. Annual 2,340
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,007 577,920 kWh $0.05
Electricity Demand $60,295 2,854 kW-months/year $21.13
Electricity Fees $606 - $ -
Natural Gas $130,964 21,872 MMBtu $5.99
TOTAL ENERGY COSTS $217,872
RECOMMENDED SAVINGS* $57,570 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,760
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$32,810
Cost:
$82,650
$8,860 197,600 $23,950 1,140 - - - - - - $8,860
197,600
kWh
$23,950
1,140
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$19,610
Cost:
$20,000
- - - - $19,610 3,365 - - - - -
-
kWh
-
-
kW-months/year
$19,610
3,365
MMBtu
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,920
Cost:
$3,750
$1,240 27,700 $2,680 128 - - - - - - $1,240
27,700
kWh
$2,680
128
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,230
Cost:
$2,460
$660 14,800 - - - - $120 - $450 - $660
14,800
kWh
-
-
kW-months/year
-
-
MMBtu
$120
-
$
$450
-
$
TOTAL RECOMMENDED Savings:
$57,570
Cost:
$108,860
$10,760 240,100 $26,630 1,268 $19,610 3,365 $120 - $450 - $10,760
240,100
kWh
$26,630
1,268
kW-months/year
$19,610
3,365
MMBtu
$120
-
$
$450
-
$
TOTAL IMPLEMENTED Savings:
$24,760
Cost:
$26,210
$1,900 42,500 $2,680 128 $19,610 3,365 $120 - $450 - $1,900
42,500
kWh
$2,680
128
kW-months/year
$19,610
3,365
MMBtu
$120
-
$
$450
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost