IAC logo
IAC Assessment: CO0703
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0703
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2015
Principal Product Bakery Products
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 99,200
Annual Production 56,851,006 Pounds
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $273,859 6,365,661 kWh $0.04
Electricity Demand $222,518 11,927 kW-months/year $18.66
Electricity Fees $4,636 - $ -
Natural Gas $240,878 44,800 MMBtu $5.38
TOTAL ENERGY COSTS $741,891
RECOMMENDED SAVINGS* $30,340 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,050
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$13,680
Cost:
$14,840
$7,510 173,700 $6,170 334 - - $7,510
173,700
kWh
$6,170
334
kW-months/year
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,400
Cost:
$1,180
$1,870 43,300 $1,530 83 - - $1,870
43,300
kWh
$1,530
83
kW-months/year
-
-
MMBtu
03: 2.2626 AVOID FROST FORMATION ON EVAPORATORS Savings:
$3,080
Cost:
$5,460
$3,080 71,200 - - - - $3,080
71,200
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,860
Cost:
$60
$1,570 36,400 $1,290 70 - - $1,570
36,400
kWh
$1,290
70
kW-months/year
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,290
Cost:
$3,760
$810 18,700 $480 26 - - $810
18,700
kWh
$480
26
kW-months/year
-
-
MMBtu
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,030
Cost:
$12,680
$(-180) (-4,200) $(-110) (-6) $6,320 1,288 $(-180)
(-4,200)
kWh
$(-110)
(-6)
kW-months/year
$6,320
1,288
MMBtu
TOTAL RECOMMENDED Savings:
$30,340
Cost:
$37,980
$14,660 339,100 $9,360 507 $6,320 1,288 $14,660
339,100
kWh
$9,360
507
kW-months/year
$6,320
1,288
MMBtu
TOTAL IMPLEMENTED Savings:
$18,050
Cost:
$24,060
$11,400 263,600 $6,650 360 - - $11,400
263,600
kWh
$6,650
360
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas