IAC Assessment: CO0711
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0711
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2015
Principal Product Contract Machined Metal Parts
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 41,200
Annual Production 1,000,000 Pieces
Production Hrs. Annual 5,300
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,248 1,427,040 kWh $0.04
Electricity Demand $113,849 5,430 kW-months/year $20.97
Electricity Fees $1,180 - $ -
Natural Gas $13,516 2,301 MMBtu $5.87
TOTAL ENERGY COSTS $190,793
RECOMMENDED SAVINGS* $13,570 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,360
Cost:
$620
$3,340 82,200 $4,020 186 - - - - - - $3,340
82,200
kWh
$4,020
186
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$900
Cost:
$960
- - - - $900 160 - - - - -
-
kWh
-
-
kW-months/year
$900
160
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$350
Cost:
$340
$160 4,000 $190 9 - - - - - - $160
4,000
kWh
$190
9
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,960
Cost:
$15,540
$1,700 41,800 $2,840 132 - - $130 - $290 - $1,700
41,800
kWh
$2,840
132
kW-months/year
-
-
MMBtu
$130
-
$
$290
-
$
TOTAL RECOMMENDED Savings:
$13,570
Cost:
$17,460
$5,200 128,000 $7,050 327 $900 160 $130 - $290 - $5,200
128,000
kWh
$7,050
327
kW-months/year
$900
160
MMBtu
$130
-
$
$290
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost