IAC Assessment: CO0712
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0712
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2015
Principal Product Molded Plastic Parts and Fabricated Metal Parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 52,535
Annual Production 192,000 Pounds
Production Hrs. Annual 3,822
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,313 1,527,937 kWh $0.04
Electricity Demand $110,737 5,273 kW-months/year $21.00
Electricity Fees $1,951 - $ -
Natural Gas $15,096 1,947 MMBtu $7.75
TOTAL ENERGY COSTS $196,097
RECOMMENDED SAVINGS* $16,370 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,140
Cost:
$22,400
$5,490 134,800 $4,650 215 - - - - $5,490
134,800
kWh
$4,650
215
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,050
Cost:
$1,000
$2,220 54,600 $1,830 85 - - - - $2,220
54,600
kWh
$1,830
85
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,180
Cost:
$7,940
$590 14,500 $1,470 68 $10 - $110 - $590
14,500
kWh
$1,470
68
kW-months/year
$10
-
$
$110
-
$
TOTAL RECOMMENDED Savings:
$16,370
Cost:
$31,340
$8,300 203,900 $7,950 368 $10 - $110 - $8,300
203,900
kWh
$7,950
368
kW-months/year
$10
-
$
$110
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost