Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2015 |
Principal Product | Cabinetry and Millwork |
NAICS | 337110 - Wood Kitchen Cabinet and Countertop Manufacturing |
SIC | 2434 - Wood Kitchen Cabinets |
Sales | $10,000,000-$50,000,000 |
# of Employees | 79 |
Plant Area (Sq.Ft.) | 38,500 |
Annual Production | 14,000,000 Pieces |
Production Hrs. Annual | 2,938 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $43,090 | 985,600 | kWh | $0.04 |
Electricity Demand | $70,595 | 3,410 | kW-months/year | $20.70 |
Electricity Fees | $590 | - | $ | - |
Natural Gas | $33,365 | 4,953 | MMBtu | $6.74 |
TOTAL ENERGY COSTS | $159,630 | |||
RECOMMENDED SAVINGS* | $53,690 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,700 Cost: $1,530 |
$2,200 | 57,500 | $2,500 | 124 | - | - | - | - | - | - | - | - |
$2,200 57,500 kWh |
$2,500 124 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,340 Cost: $4,390 |
$590 | 15,600 | $1,750 | 86 | - | - | - | - | - | - | - | - |
$590 15,600 kWh |
$1,750 86 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $29,650 Cost: $240 |
- | - | - | - | - | - | - | - | $29,650 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$29,650 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $9,310 Cost: $36,000 |
$2,570 | 67,400 | $4,370 | 216 | $11,730 | 174,700 | $(-9,360) | - | - | - | - | - |
$2,570 67,400 kWh |
$4,370 216 kW-months/year |
$11,730 174,700 lb |
$(-9,360) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,690 Cost: $41,900 |
$2,380 | 62,400 | $5,310 | 262 | - | - | $400 | - | - | - | $(-400) | - |
$2,380 62,400 kWh |
$5,310 262 kW-months/year |
- - lb |
$400 - $ |
- - $ |
$(-400) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,690 Cost: $84,060 |
$7,740 | 202,900 | $13,930 | 688 | $11,730 | 174,700 | $(-8,960) | - | $29,650 | - | $(-400) | - | $7,740 202,900 kWh |
$13,930 688 kW-months/year |
$11,730 174,700 lb |
$(-8,960) - $ |
$29,650 - $ |
$(-400) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost |