IAC logo
IAC Assessment: CO0714
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0714
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2015
Principal Product Cabinetry and Millwork
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 79
Plant Area (Sq.Ft.) 38,500
Annual Production 14,000,000 Pieces
Production Hrs. Annual 2,938
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,090 985,600 kWh $0.04
Electricity Demand $70,595 3,410 kW-months/year $20.70
Electricity Fees $590 - $ -
Natural Gas $33,365 4,953 MMBtu $6.74
TOTAL ENERGY COSTS $159,630
RECOMMENDED SAVINGS* $53,690 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,700
Cost:
$1,530
$2,200 57,500 $2,500 124 - - - - - - - - $2,200
57,500
kWh
$2,500
124
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,340
Cost:
$4,390
$590 15,600 $1,750 86 - - - - - - - - $590
15,600
kWh
$1,750
86
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$29,650
Cost:
$240
- - - - - - - - $29,650 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$29,650
-
$
-
-
$
04: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$9,310
Cost:
$36,000
$2,570 67,400 $4,370 216 $11,730 174,700 $(-9,360) - - - - - $2,570
67,400
kWh
$4,370
216
kW-months/year
$11,730
174,700
lb
$(-9,360)
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,690
Cost:
$41,900
$2,380 62,400 $5,310 262 - - $400 - - - $(-400) - $2,380
62,400
kWh
$5,310
262
kW-months/year
-
-
lb
$400
-
$
-
-
$
$(-400)
-
$
TOTAL RECOMMENDED Savings:
$53,690
Cost:
$84,060
$7,740 202,900 $13,930 688 $11,730 174,700 $(-8,960) - $29,650 - $(-400) - $7,740
202,900
kWh
$13,930
688
kW-months/year
$11,730
174,700
lb
$(-8,960)
-
$
$29,650
-
$
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost