IAC logo
IAC Assessment: CO0716
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0716
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2015
Principal Product Cast acrylic parts
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 82,032
Annual Production 200,000,000 Pounds
Production Hrs. Annual 4,290
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,674 2,734,665 kWh $0.04
Electricity Demand $152,771 7,332 kW-months/year $20.84
Electricity Fees $1,183 - $ -
Natural Gas $81,743 14,623 MMBtu $5.59
TOTAL ENERGY COSTS $343,371
RECOMMENDED SAVINGS* $19,230 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,570
Cost:
$22,400
$1,150 29,800 $3,420 166 - - - - - - $1,150
29,800
kWh
$3,420
166
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,790
Cost:
$5,130
$920 23,700 $1,870 91 - - - - - - $920
23,700
kWh
$1,870
91
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,330
Cost:
$570
$530 13,800 $800 39 - - - - - - $530
13,800
kWh
$800
39
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$6,740
Cost:
$1,000
- - - - - - $6,740 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,740
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,800
Cost:
$12,730
$1,030 26,700 $1,870 91 $20 - - - $880 - $1,030
26,700
kWh
$1,870
91
kW-months/year
$20
-
$
-
-
$
$880
-
$
TOTAL RECOMMENDED Savings:
$19,230
Cost:
$41,830
$3,630 94,000 $7,960 387 $20 - $6,740 - $880 - $3,630
94,000
kWh
$7,960
387
kW-months/year
$20
-
$
$6,740
-
$
$880
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $