IAC logo
IAC Assessment: CO0718
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0718
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2016
Principal Product MDF Doors
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 154,116
Annual Production 200,000 Pieces
Production Hrs. Annual 6,552
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,761 4,851,104 kWh $0.04
Electricity Demand $261,230 13,110 kW-months/year $19.93
Electricity Fees $3,496 - $ -
Natural Gas $47,946 7,517 MMBtu $6.38
LPG $30,261 831 MMBtu $36.42
TOTAL ENERGY COSTS $536,694
RECOMMENDED SAVINGS* $30,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,270
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,760
Cost:
$9,430
$2,600 69,300 $3,160 158 - - - - - - $2,600
69,300
kWh
$3,160
158
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,510
Cost:
$23,940
$6,980 186,100 $10,690 535 $40 - - - $(-2,200) - $6,980
186,100
kWh
$10,690
535
kW-months/year
$40
-
$
-
-
$
$(-2,200)
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$5,670
Cost:
$31,320
$4,750 45,800 - - - - $920 - - - $4,750
45,800
kWh
-
-
kW-months/year
-
-
$
$920
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,760
Cost:
$2,500
- - - - - - $2,760 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,760
-
$
-
-
$
05: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$770
Cost:
$3,450
$150 4,100 $620 31 - - - - - - $150
4,100
kWh
$620
31
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$30,470
Cost:
$70,640
$14,480 305,300 $14,470 724 $40 - $3,680 - $(-2,200) - $14,480
305,300
kWh
$14,470
724
kW-months/year
$40
-
$
$3,680
-
$
$(-2,200)
-
$
TOTAL IMPLEMENTED Savings:
$18,270
Cost:
$26,440
$6,980 186,100 $10,690 535 $40 - $2,760 - $(-2,200) - $6,980
186,100
kWh
$10,690
535
kW-months/year
$40
-
$
$2,760
-
$
$(-2,200)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost