Assessment Year 2016
Principal Product Fabricated structural steel
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 140,433
Annual Production 175,000 Pieces
Production Hrs. Annual 2,392
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,859 1,557,396 kWh $0.04
Electricity Demand $126,454 7,062 kW-months/year $17.91
Electricity Fees $4,659 - $ -
Natural Gas $45,663 7,655 MMBtu $5.97
TOTAL ENERGY COSTS $235,635
RECOMMENDED SAVINGS* $22,100 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,340
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,340
Cost:
$1,500
$1,340 39,400 $2,000 116 - - - - $1,340
39,400
kWh
$2,000
116
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,680
Cost:
$57,330
$4,600 133,300 $10,370 597 $150 - $560 - $4,600
133,300
kWh
$10,370
597
kW-months/year
$150
-
$
$560
-
$
03: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$3,080
Cost:
$13,230
$590 16,700 $2,490 128 - - - - $590
16,700
kWh
$2,490
128
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,100
Cost:
$72,060
$6,530 189,400 $14,860 841 $150 - $560 - $6,530
189,400
kWh
$14,860
841
kW-months/year
$150
-
$
$560
-
$
TOTAL IMPLEMENTED Savings:
$3,340
Cost:
$1,500
$1,340 39,400 $2,000 116 - - - - $1,340
39,400
kWh
$2,000
116
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost