IAC Assessment: CO0726
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0726
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2016
Principal Product Aftermarket Mining Equipment Components
NAICS 333131 - Mining Machinery and Equipment Manufacturing
SIC 3532 - Mining Machinery
Sales $10,000,000-$50,000,000
# of Employees 88
Plant Area (Sq.Ft.) 83,400
Annual Production 10,000 Pieces
Production Hrs. Annual 4,420
Location (State) MT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,276 1,051,576 kWh $0.07
Electricity Demand $61,250 5,449 kW-months/year $11.24
Electricity Fees $1,624 - $ -
Natural Gas $17,388 2,975 MMBtu $5.84
TOTAL ENERGY COSTS $158,838
RECOMMENDED SAVINGS* $16,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$680
Cost:
$1,630
$490 7,400 $190 17 - - - - - - - - $490
7,400
kWh
$190
17
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$380
Cost:
$660
$240 3,600 $140 12 - - - - - - - - $240
3,600
kWh
$140
12
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,470
Cost:
$36,440
$7,310 109,800 $3,660 326 - - - - $270 - $(-770) - $7,310
109,800
kWh
$3,660
326
kW-months/year
-
-
MMBtu
-
-
gal
$270
-
$
$(-770)
-
$
04: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$5,380
Cost:
$5,270
- - - - $2,080 364 $3,300 3,250 - - - - -
-
kWh
-
-
kW-months/year
$2,080
364
MMBtu
$3,300
3,250
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,910
Cost:
$44,000
$8,040 120,800 $3,990 355 $2,080 364 $3,300 3,250 $270 - $(-770) - $8,040
120,800
kWh
$3,990
355
kW-months/year
$2,080
364
MMBtu
$3,300
3,250
gal
$270
-
$
$(-770)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost