IAC logo
IAC Assessment: CO0729
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0729
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2016
Principal Product Semiconductor manufacturing equipment
NAICS 333242 - Semiconductor Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 225
Plant Area (Sq.Ft.) 51,200
Annual Production 80 Units
Production Hrs. Annual 8,760
Location (State) MT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $363,789 9,510,440 kWh $0.04
Electricity Demand $90,616 15,588 kW-months/year $5.81
Electricity Fees $2,717 - $ -
Natural Gas $106,663 15,985 MMBtu $6.67
TOTAL ENERGY COSTS $599,785
RECOMMENDED SAVINGS* $129,030 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$70,080
Cost:
$60,480
- - - - $40,080 6,140 $30,000 11,250 - - - - -
-
kWh
-
-
kW-months/year
$40,080
6,140
MMBtu
$30,000
11,250
gal
-
-
$
-
-
$
02: 3.5142 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS Savings:
$25,340
Cost:
$123,200
$(-2,840) (-72,900) $(-620) (-100) - - - - - - $28,800 - $(-2,840)
(-72,900)
kWh
$(-620)
(-100)
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$28,800
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,510
Cost:
$51,780
$24,580 606,300 $5,010 898 - - - - $610 - $1,310 - $24,580
606,300
kWh
$5,010
898
kW-months/year
-
-
MMBtu
-
-
gal
$610
-
$
$1,310
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,100
Cost:
$6,040
$1,720 44,200 $380 61 - - - - - - - - $1,720
44,200
kWh
$380
61
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$129,030
Cost:
$241,500
$23,460 577,600 $4,770 859 $40,080 6,140 $30,000 11,250 $610 - $30,110 - $23,460
577,600
kWh
$4,770
859
kW-months/year
$40,080
6,140
MMBtu
$30,000
11,250
gal
$610
-
$
$30,110
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost