IAC logo
IAC Assessment: CO0730
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0730
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2016
Principal Product Machined parts for semiconductor manufacturing equipment
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 77,912
Annual Production 90 Units
Production Hrs. Annual 4,420
Location (State) MT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,024 2,965,540 kWh $0.04
Electricity Demand $60,803 10,013 kW-months/year $6.07
Electricity Fees $1,986 - $ -
Natural Gas $30,797 4,630 MMBtu $6.65
TOTAL ENERGY COSTS $208,610
RECOMMENDED SAVINGS* $27,290 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,590
Cost:
$1,680
$7,040 175,800 $1,550 241 - - - - - - $7,040
175,800
kWh
$1,550
241
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,690
Cost:
$20,770
$4,690 117,000 - - - - - - - - $4,690
117,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2514 COVER OPEN TANKS Savings:
$7,390
Cost:
$12,880
- - - - $7,390 1,148 - - - - -
-
kWh
-
-
kW-months/year
$7,390
1,148
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,620
Cost:
$11,750
$6,270 156,500 $1,560 242 - - $200 - $(-1,410) - $6,270
156,500
kWh
$1,560
242
kW-months/year
-
-
MMBtu
$200
-
$
$(-1,410)
-
$
TOTAL RECOMMENDED Savings:
$27,290
Cost:
$47,080
$18,000 449,300 $3,110 483 $7,390 1,148 $200 - $(-1,410) - $18,000
449,300
kWh
$3,110
483
kW-months/year
$7,390
1,148
MMBtu
$200
-
$
$(-1,410)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost