IAC logo
IAC Assessment: CO0732
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0732
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2016
Principal Product Custom pressure vessels and custom fabrications
NAICS 332313 - Plate Work Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 73,800
Annual Production 100,000 Units
Production Hrs. Annual 2,210
Location (State) WY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,485 821,640 kWh $0.04
Electricity Demand $74,590 4,189 kW-months/year $17.81
Electricity Fees $876 - $ -
Natural Gas $73,587 12,260 MMBtu $6.00
TOTAL ENERGY COSTS $180,538
RECOMMENDED SAVINGS* $36,380 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,620
Cost:
$12,560
$220 5,700 $3,820 220 $7,580 1,398 - - - - $220
5,700
kWh
$3,820
220
kW-months/year
$7,580
1,398
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,690
Cost:
$840
$1,360 34,900 $3,330 190 - - - - - - $1,360
34,900
kWh
$3,330
190
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,070
Cost:
$46,190
$5,480 141,200 $13,270 765 - - $200 - $1,120 - $5,480
141,200
kWh
$13,270
765
kW-months/year
-
-
MMBtu
$200
-
$
$1,120
-
$
TOTAL RECOMMENDED Savings:
$36,380
Cost:
$59,590
$7,060 181,800 $20,420 1,175 $7,580 1,398 $200 - $1,120 - $7,060
181,800
kWh
$20,420
1,175
kW-months/year
$7,580
1,398
MMBtu
$200
-
$
$1,120
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost