Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2021 |
Principal Product | beer |
NAICS | 312120 - Breweries |
SIC | 2082 - Malt Beverages |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 130,000 BBL |
Production Hrs. Annual | 8,400 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $97,611 | 2,225,438 | kWh | $0.04 |
Electricity Demand | $109,006 | 5,769 | kW-months/year | $18.90 |
Electricity Fees | $501 | - | $ | - |
Natural Gas | $86,498 | 19,195 | MMBtu | $4.51 |
TOTAL ENERGY COSTS | $401,955 | |||
RECOMMENDED SAVINGS* | $28,748 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $28,472 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Gaseous Waste | Electricity Usage | Electricity Demand | Gaseous Waste | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL |
Savings: $10,391 Cost: $42,800 |
$1,087 | 25,393 | $9,304 | 472 | - | - |
$1,087 25,393 kWh |
$9,304 472 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $1,867 Cost: $5,500 |
$614 | 14,354 | $1,253 | 64 | - | - |
$614 14,354 kWh |
$1,253 64 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,685 Cost: $3,756 |
$1,380 | 32,245 | $1,305 | 66 | - | - |
$1,380 32,245 kWh |
$1,305 66 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,196 Cost: $200 |
$680 | 15,892 | $516 | 26 | - | - |
$680 15,892 kWh |
$516 26 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $12,333 Cost: $94,800 |
- | - | - | - | $12,333 | 183,456 |
- - kWh |
- - kW-months/year |
$12,333 183,456 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $276 Cost: $723 |
$276 | 6,324 | - | - | - | - |
$276 6,324 kWh |
- - kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,748 Cost: $147,779 |
$4,037 | 94,208 | $12,378 | 628 | $12,333 | 183,456 | $4,037 94,208 kWh |
$12,378 628 kW-months/year |
$12,333 183,456 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $28,472 Cost: $147,056 |
$3,761 | 87,884 | $12,378 | 628 | $12,333 | 183,456 | $3,761 87,884 kWh |
$12,378 628 kW-months/year |
$12,333 183,456 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Gaseous Waste | Electricity Usage | Electricity Demand | Gaseous Waste |