IAC logo
IAC Assessment: CO0737
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0737
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2021
Principal Product beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 80,000
Annual Production 130,000 BBL
Production Hrs. Annual 8,400
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,611 2,225,438 kWh $0.04
Electricity Demand $109,006 5,769 kW-months/year $18.90
Electricity Fees $501 - $ -
Natural Gas $86,498 19,195 MMBtu $4.51
TOTAL ENERGY COSTS $401,955
RECOMMENDED SAVINGS* $28,748 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,472
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Gaseous Waste Electricity Usage Electricity Demand Gaseous Waste
$ kWh $ kW-months/year $ lb
01: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$10,391
Cost:
$42,800
$1,087 25,393 $9,304 472 - - $1,087
25,393
kWh
$9,304
472
kW-months/year
-
-
lb
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,867
Cost:
$5,500
$614 14,354 $1,253 64 - - $614
14,354
kWh
$1,253
64
kW-months/year
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,685
Cost:
$3,756
$1,380 32,245 $1,305 66 - - $1,380
32,245
kWh
$1,305
66
kW-months/year
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,196
Cost:
$200
$680 15,892 $516 26 - - $680
15,892
kWh
$516
26
kW-months/year
-
-
lb
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$12,333
Cost:
$94,800
- - - - $12,333 183,456 -
-
kWh
-
-
kW-months/year
$12,333
183,456
lb
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$276
Cost:
$723
$276 6,324 - - - - $276
6,324
kWh
-
-
kW-months/year
-
-
lb
TOTAL RECOMMENDED Savings:
$28,748
Cost:
$147,779
$4,037 94,208 $12,378 628 $12,333 183,456 $4,037
94,208
kWh
$12,378
628
kW-months/year
$12,333
183,456
lb
TOTAL IMPLEMENTED Savings:
$28,472
Cost:
$147,056
$3,761 87,884 $12,378 628 $12,333 183,456 $3,761
87,884
kWh
$12,378
628
kW-months/year
$12,333
183,456
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Gaseous Waste Electricity Usage Electricity Demand Gaseous Waste