IAC Assessment: CO0742
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0742
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2021
Principal Product Specialty turbomachinery
NAICS 333996 - Fluid Power Pump and Motor Manufacturing
SIC 3594 - Fluid Power Pumps And Motors
Sales $50,000,000-$100,000,000
# of Employees 160
Plant Area (Sq.Ft.) 90,000
Annual Production 1 Units
Production Hrs. Annual 5,500
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,764 1,764,194 kWh $0.05
Electricity Demand $91,554 5,846 kW-months/year $15.66
Electricity Fees $16,440 - $ -
Natural Gas $19,561 2,584 MMBtu $7.57
TOTAL ENERGY COSTS $222,319
RECOMMENDED SAVINGS* $94,112 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,629
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$83,984
Cost:
$462,079
$43,845 816,253 $9,530 608 $30,609 - $43,845
816,253
kWh
$9,530
608
kW-months/year
$30,609
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,833
Cost:
$2,733
$2,343 43,626 $1,490 95 - - $2,343
43,626
kWh
$1,490
95
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,478
Cost:
$359
$1,478 27,515 - - - - $1,478
27,515
kWh
-
-
kW-months/year
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,318
Cost:
$16,143
$1,709 31,830 $1,609 103 - - $1,709
31,830
kWh
$1,609
103
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,499
Cost:
$200
$374 6,961 $1,125 72 - - $374
6,961
kWh
$1,125
72
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$94,112
Cost:
$481,514
$49,749 926,185 $13,754 878 $30,609 - $49,749
926,185
kWh
$13,754
878
kW-months/year
$30,609
-
$
TOTAL IMPLEMENTED Savings:
$8,629
Cost:
$19,235
$5,530 102,971 $3,099 198 - - $5,530
102,971
kWh
$3,099
198
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost