Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Case Western Reserve University |
---|---|
Assessment Year | 2021 |
Principal Product | Machine Rail Parts |
NAICS | 334519 - Other Measuring and Controlling Device Manufacturing |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 100,000 Units |
Production Hrs. Annual | 8,400 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $90,221 | 2,000,200 | kWh | $0.05 |
Electricity Demand | $61,661 | 4,195 | kW-months/year | $14.70 |
Electricity Fees | $24,072 | - | $ | - |
Natural Gas | $20,274 | 3,576 | MMBtu | $5.67 |
TOTAL ENERGY COSTS | $244,536 | |||
RECOMMENDED SAVINGS* | $48,768 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,425 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $4,804 Cost: - |
$4,804 | 114,864 | - | - | - | - |
$4,804 114,864 kWh |
- - kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $3,402 Cost: $1,640 |
$3,402 | 81,358 | - | - | - | - |
$3,402 81,358 kWh |
- - kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,554 Cost: - |
$3,554 | 84,972 | - | - | - | - |
$3,554 84,972 kWh |
- - kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,741 Cost: $613 |
$1,741 | 41,634 | - | - | - | - |
$1,741 41,634 kWh |
- - kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $8,381 Cost: $6,000 |
$2,696 | 64,467 | $5,685 | 387 | - | - |
$2,696 64,467 kWh |
$5,685 387 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $21,048 Cost: $10,400 |
- | - | - | - | $21,048 | 3,066 |
- - kWh |
- - kW-months/year |
$21,048 3,066 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING |
Savings: $5,837 Cost: $1,000 |
$5,837 | 139,581 | - | - | - | - |
$5,837 139,581 kWh |
- - kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $48,768 Cost: $19,653 |
$22,034 | 526,877 | $5,685 | 387 | $21,048 | 3,066 | $22,034 526,877 kWh |
$5,685 387 kW-months/year |
$21,048 3,066 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,425 Cost: $8,640 |
$16,739 | 400,271 | $5,685 | 387 | - | - | $16,739 400,271 kWh |
$5,685 387 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Other Liquid (non-haz) |