IAC logo
IAC Assessment: CW0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CW0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Case Western Reserve University
Assessment Year 2021
Principal Product Machine Rail Parts
NAICS 334519 - Other Measuring and Controlling Device Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 120,000
Annual Production 100,000 Units
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,221 2,000,200 kWh $0.05
Electricity Demand $61,661 4,195 kW-months/year $14.70
Electricity Fees $24,072 - $ -
Natural Gas $20,274 3,576 MMBtu $5.67
TOTAL ENERGY COSTS $244,536
RECOMMENDED SAVINGS* $48,768 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,425
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Electricity Usage Electricity Demand Other Liquid (non-haz)
$ kWh $ kW-months/year $ gal
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,804
Cost:
-
$4,804 114,864 - - - - $4,804
114,864
kWh
-
-
kW-months/year
-
-
gal
02: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$3,402
Cost:
$1,640
$3,402 81,358 - - - - $3,402
81,358
kWh
-
-
kW-months/year
-
-
gal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,554
Cost:
-
$3,554 84,972 - - - - $3,554
84,972
kWh
-
-
kW-months/year
-
-
gal
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,741
Cost:
$613
$1,741 41,634 - - - - $1,741
41,634
kWh
-
-
kW-months/year
-
-
gal
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$8,381
Cost:
$6,000
$2,696 64,467 $5,685 387 - - $2,696
64,467
kWh
$5,685
387
kW-months/year
-
-
gal
06: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$21,048
Cost:
$10,400
- - - - $21,048 3,066 -
-
kWh
-
-
kW-months/year
$21,048
3,066
gal
07: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$5,837
Cost:
$1,000
$5,837 139,581 - - - - $5,837
139,581
kWh
-
-
kW-months/year
-
-
gal
TOTAL RECOMMENDED Savings:
$48,768
Cost:
$19,653
$22,034 526,877 $5,685 387 $21,048 3,066 $22,034
526,877
kWh
$5,685
387
kW-months/year
$21,048
3,066
gal
TOTAL IMPLEMENTED Savings:
$22,425
Cost:
$8,640
$16,739 400,271 $5,685 387 - - $16,739
400,271
kWh
$5,685
387
kW-months/year
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ gal
Electricity Usage Electricity Demand Other Liquid (non-haz) Electricity Usage Electricity Demand Other Liquid (non-haz)