IAC Assessment: CW0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CW0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Case Western Reserve University
Assessment Year 2022
Principal Product Excavators and Vacuum Trucks
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 422,753
Annual Production 6,507 Tons
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $335,641 4,389,000 kWh $0.08
Natural Gas $272,862 123,540 MMBtu $2.21
TOTAL ENERGY COSTS $618,192
RECOMMENDED SAVINGS* $199,286 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ Tgal $ Tgal $ $
01: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$11,974
Cost:
$2,500
- - - - $5,868 423 $6,106 432 - - -
-
kWh
-
-
MMBtu
$5,868
423
Tgal
$6,106
432
Tgal
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,767
Cost:
$400
$299 3,929 $3,469 1,570 - - - - - - $299
3,929
kWh
$3,469
1,570
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 3.2173 CONVERT TO ROBOTIC PAINTING Savings:
$102,960
Cost:
$48,500
- - - - - - - - $102,960 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$102,960
-
$
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$25,171
Cost:
$73,990
$25,171 331,200 - - - - - - - - $25,171
331,200
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$13,037
Cost:
$60,000
$13,037 171,543 - - - - - - - - $13,037
171,543
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$42,376
Cost:
$188,648
- - $42,376 19,196 - - - - - - -
-
kWh
$42,376
19,196
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$199,286
Cost:
$374,038
$38,507 506,672 $45,845 20,765 $5,868 423 $6,106 432 $102,960 - $38,507
506,672
kWh
$45,845
20,765
MMBtu
$5,868
423
Tgal
$6,106
432
Tgal
$102,960
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost