IAC Assessment: DL0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2007
Principal Product Corrugated Cardboard Boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 230,000
Annual Production 600,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $542,211 5,533,205 kWh $0.10
Electricity Demand $68,528 1,128 kW-months/year $60.75
Electricity Fees $3,450 - $ -
Natural Gas $392,010 45,830 MMBtu $8.55
TOTAL ENERGY COSTS $1,024,937
RECOMMENDED SAVINGS* $196,763 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,526
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$14,287
Cost:
$45,000
$14,287 145,800 - - - - $14,287
145,800
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$47,542
Cost:
$92,679
$46,731 477,122 $811 58 - - $46,731
477,122
kWh
$811
58
kW-months/year
-
-
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$25,891
Cost:
$2,000
- - - - $25,891 2,802 -
-
kWh
-
-
kW-months/year
$25,891
2,802
MMBtu
04: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$1,497
Cost:
-
- - - - $1,497 162 -
-
kWh
-
-
kW-months/year
$1,497
162
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$24,500
Cost:
$10,000
- - - - $24,500 2,651 -
-
kWh
-
-
kW-months/year
$24,500
2,651
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$51,975
Cost:
$25,000
- - - - $51,975 5,625 -
-
kWh
-
-
kW-months/year
$51,975
5,625
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$23,137
Cost:
$20,000
- - - - $23,137 2,504 -
-
kWh
-
-
kW-months/year
$23,137
2,504
MMBtu
08: 2.1224 REPLACE BOILER Savings:
$4,572
Cost:
$15,400
- - - - $4,572 497 -
-
kWh
-
-
kW-months/year
$4,572
497
MMBtu
09: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$1,892
Cost:
-
- - - - $1,892 205 -
-
kWh
-
-
kW-months/year
$1,892
205
MMBtu
10: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,470
Cost:
$40,500
$1,470 15,000 - - - - $1,470
15,000
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$196,763
Cost:
$250,579
$62,488 637,922 $811 58 $133,464 14,446 $62,488
637,922
kWh
$811
58
kW-months/year
$133,464
14,446
MMBtu
TOTAL IMPLEMENTED Savings:
$26,526
Cost:
$20,000
- - - - $26,526 2,871 -
-
kWh
-
-
kW-months/year
$26,526
2,871
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas