IAC logo
IAC Assessment: DL0012
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0012
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2008
Principal Product noise control and thermal applications
NAICS 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 76,000
Annual Production 1,500 Thousand Feet
Production Hrs. Annual 8,736
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,925 913,000 kWh $0.06
Electricity Demand $39,575 199 kW-months/year $198.87
Electricity Fees $4,462 - $ -
Natural Gas $33,705 2,472 MMBtu $13.63
TOTAL ENERGY COSTS $138,344
RECOMMENDED SAVINGS* $67,003 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,593
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,593
Cost:
$26,675
$27,047 245,880 $546 38 - - - - $27,047
245,880
kWh
$546
38
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$19,600
Cost:
$23,900
- - - - $19,600 1,413 - - -
-
kWh
-
-
kW-months/year
$19,600
1,413
MMBtu
-
-
$
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$5,988
Cost:
$146
- - - - $5,988 379 - - -
-
kWh
-
-
kW-months/year
$5,988
379
MMBtu
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$6,766
Cost:
$16,500
- - - - $6,766 428 - - -
-
kWh
-
-
kW-months/year
$6,766
428
MMBtu
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,154
Cost:
-
- - - - - - $3,154 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,154
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,902
Cost:
$11,000
$3,902 34,968 - - - - - - $3,902
34,968
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$67,003
Cost:
$78,221
$30,949 280,848 $546 38 $32,354 2,220 $3,154 - $30,949
280,848
kWh
$546
38
kW-months/year
$32,354
2,220
MMBtu
$3,154
-
$
TOTAL IMPLEMENTED Savings:
$27,593
Cost:
$26,675
$27,047 245,880 $546 38 - - - - $27,047
245,880
kWh
$546
38
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes