IAC logo
IAC Assessment: DL0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2008
Principal Product Resins and associated chemicals, coatings and slit rolls
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 99
Plant Area (Sq.Ft.) 20,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $640,990 6,979,376 kWh $0.09
Electricity Demand $86,778 1,191 kW-months/year $72.86
Natural Gas $164,047 172,510 MMBtu $0.95
TOTAL ENERGY COSTS $894,492
RECOMMENDED SAVINGS* $23,264 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,013
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,841
Cost:
-
$1,841 20,011 - - - - $1,841
20,011
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$738
Cost:
-
$665 7,223 $73 12 - - $665
7,223
kWh
$73
12
kW-months/year
-
-
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,007
Cost:
$800
$1,007 10,950 - - - - $1,007
10,950
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7293 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS Savings:
$6,100
Cost:
$12,100
$2,500 30,000 $3,600 360 - - $2,500
30,000
kWh
$3,600
360
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,006
Cost:
$26,496
$9,006 87,439 - - - - $9,006
87,439
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,572
Cost:
$165,000
- - - - $4,572 497 -
-
kWh
-
-
kW-months/year
$4,572
497
MMBtu
TOTAL RECOMMENDED Savings:
$23,264
Cost:
$204,396
$15,019 155,623 $3,673 372 $4,572 497 $15,019
155,623
kWh
$3,673
372
kW-months/year
$4,572
497
MMBtu
TOTAL IMPLEMENTED Savings:
$10,013
Cost:
$27,296
$10,013 98,389 - - - - $10,013
98,389
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas