Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2008 |
Principal Product | Surfactants |
NAICS | 325613 - Surface Active Agent Manufacturing |
SIC | 2843 - Surface Active Agents |
Sales | $100,000,000-$500,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 140,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | DE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,490,000 | 30,000,000 | kWh | $0.08 |
Electricity Demand | $48,300 | 6,773 | kW-months/year | $7.13 |
Natural Gas | $6,234,000 | 61,947,864 | MMBtu | $0.10 |
TOTAL ENERGY COSTS | $8,936,857 | |||
RECOMMENDED SAVINGS* | $1,411,080 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,006,480 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $425,000 Cost: $120,000 |
- | - | $425,000 | 45,900 |
- - kWh |
$425,000 45,900 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $207,000 Cost: $250,000 |
- | - | $207,000 | 22,400 |
- - kWh |
$207,000 22,400 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $188,000 Cost: $108,000 |
- | - | $188,000 | 20,300 |
- - kWh |
$188,000 20,300 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $166,310 Cost: $35,000 |
- | - | $166,310 | 17,960 |
- - kWh |
$166,310 17,960 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $141,700 Cost: $107,400 |
$141,700 | 1,707,000 | - | - |
$141,700 1,707,000 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $102,500 Cost: $300,000 |
$102,500 | 1,235,000 | - | - |
$102,500 1,235,000 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $56,800 Cost: $129,000 |
- | - | $56,800 | 4,910 |
- - kWh |
$56,800 4,910 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $44,400 Cost: $35,000 |
- | - | $44,400 | 4,800 |
- - kWh |
$44,400 4,800 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $33,200 Cost: $16,000 |
$33,200 | 400,000 | - | - |
$33,200 400,000 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $26,000 Cost: $175,000 |
- | - | $26,000 | 2,800 |
- - kWh |
$26,000 2,800 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,300 Cost: $183,000 |
$14,300 | 151,000 | - | - |
$14,300 151,000 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7314 REDUCE VENTILATION AIR |
Savings: $5,870 Cost: - |
$780 | 9,350 | $5,090 | 550 |
$780 9,350 kWh |
$5,090 550 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,411,080 Cost: $1,458,400 |
$292,480 | 3,502,350 | $1,118,600 | 119,620 | $292,480 3,502,350 kWh |
$1,118,600 119,620 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,006,480 Cost: $696,000 |
$15,080 | 160,350 | $991,400 | 107,110 | $15,080 160,350 kWh |
$991,400 107,110 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |