IAC Assessment: DL0032
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2008
Principal Product Tufftape, Reinforced Carton Sealing Tapes, Box Tapes
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672 - Paper Coated And Laminated, Nec
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 100,000
Annual Production 15,000,000 Units
Production Hrs. Annual 6,000
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $178,906 1,858,491 kWh $0.10
Natural Gas $271,694 23,565 MMBtu $11.53
TOTAL ENERGY COSTS $450,600
RECOMMENDED SAVINGS* $91,225 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,425
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1224 REPLACE BOILER Savings:
$30,400
Cost:
$55,000
- - $30,400 2,580 -
-
kWh
$30,400
2,580
MMBtu
02: 2.7314 REDUCE VENTILATION AIR Savings:
$19,700
Cost:
$1,200
$1,200 12,000 $18,500 1,600 $1,200
12,000
kWh
$18,500
1,600
MMBtu
03: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$12,400
Cost:
$7,000
- - $12,400 1,051 -
-
kWh
$12,400
1,051
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,639
Cost:
$31,781
$9,639 76,499 - - $9,639
76,499
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$8,400
Cost:
$7,500
- - $8,400 710 -
-
kWh
$8,400
710
MMBtu
06: 2.1224 REPLACE BOILER Savings:
$6,100
Cost:
$6,100
- - $6,100 520 -
-
kWh
$6,100
520
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,521
Cost:
$643
$2,521 23,778 - - $2,521
23,778
kWh
-
-
MMBtu
08: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$2,065
Cost:
-
- - $2,065 175 -
-
kWh
$2,065
175
MMBtu
TOTAL RECOMMENDED Savings:
$91,225
Cost:
$109,224
$13,360 112,277 $77,865 6,636 $13,360
112,277
kWh
$77,865
6,636
MMBtu
TOTAL IMPLEMENTED Savings:
$48,425
Cost:
$47,224
$13,360 112,277 $35,065 3,005 $13,360
112,277
kWh
$35,065
3,005
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas