IAC Assessment: DL0046
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0046
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2010
Principal Product Molded Rubber
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 50,000
Annual Production 4,450,000 Pieces
Production Hrs. Annual 4,000
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,455 1,090,486 kWh $0.12
Natural Gas $60,953 4,822 MMBtu $12.64
TOTAL ENERGY COSTS $190,734
RECOMMENDED SAVINGS* $39,602 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,082
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,503
Cost:
-
$4,503 40,209 - - $4,503
40,209
kWh
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,940
Cost:
-
$2,940 18,200 - - $2,940
18,200
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,292
Cost:
$520
$7,292 65,120 - - $7,292
65,120
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,168
Cost:
$1,500
$4,168 37,208 - - $4,168
37,208
kWh
-
-
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,619
Cost:
$10,000
- - $7,619 603 -
-
kWh
$7,619
603
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,295
Cost:
$23,738
$12,295 109,780 - - $12,295
109,780
kWh
-
-
MMBtu
07: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY Savings:
$785
Cost:
$2,410
$785 7,012 - - $785
7,012
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$39,602
Cost:
$38,168
$31,983 277,529 $7,619 603 $31,983
277,529
kWh
$7,619
603
MMBtu
TOTAL IMPLEMENTED Savings:
$24,082
Cost:
$35,238
$16,463 146,988 $7,619 603 $16,463
146,988
kWh
$7,619
603
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas