IAC Assessment: DL0047
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2010
Principal Product Aircraft Arresting Systems
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3479 - Metal Coating And Allied Services
Sales $50,000,000-$100,000,000
# of Employees 119
Plant Area (Sq.Ft.) 125,625
Annual Production 100,000 Pieces
Production Hrs. Annual 3,510
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,606 1,693,212 kWh $0.08
Electricity Demand $83,987 488 kW-months/year $172.10
Electricity Fees $5,739 - $ -
Natural Gas $36,512 2,761 MMBtu $13.22
TOTAL ENERGY COSTS $257,844
RECOMMENDED SAVINGS* $92,163 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,295
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,774
Cost:
-
$6,774 86,849 - - - - $6,774
86,849
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,044
Cost:
-
$1,591 24,000 - - $2,453 153 $1,591
24,000
kWh
-
-
kW-months/year
$2,453
153
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,212
Cost:
-
- - - - $2,212 138 -
-
kWh
-
-
kW-months/year
$2,212
138
MMBtu
04: 2.7122 DISCONNECT BALLASTS Savings:
$1,481
Cost:
-
$866 11,100 $615 4 - - $866
11,100
kWh
$615
4
kW-months/year
-
-
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,068
Cost:
-
$1,068 13,697 - - - - $1,068
13,697
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,117
Cost:
$690
- - - - $4,117 244 -
-
kWh
-
-
kW-months/year
$4,117
244
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$30,000
Cost:
$6,000
$25,500 301,000 $4,500 26 - - $25,500
301,000
kWh
$4,500
26
kW-months/year
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,491
Cost:
$1,573
$3,491 44,753 - - - - $3,491
44,753
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,972
Cost:
$3,840
$2,907 37,271 $2,065 12 - - $2,907
37,271
kWh
$2,065
12
kW-months/year
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,288
Cost:
$24,000
$11,278 144,585 $8,010 45 - - $11,278
144,585
kWh
$8,010
45
kW-months/year
-
-
MMBtu
11: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$750
Cost:
$2,800
$595 7,631 $155 1 - - $595
7,631
kWh
$155
1
kW-months/year
-
-
MMBtu
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,966
Cost:
$77,940
$8,626 110,596 $5,340 30 - - $8,626
110,596
kWh
$5,340
30
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$92,163
Cost:
$116,843
$62,696 781,482 $20,685 118 $8,782 535 $62,696
781,482
kWh
$20,685
118
kW-months/year
$8,782
535
MMBtu
TOTAL IMPLEMENTED Savings:
$44,295
Cost:
$10,373
$37,428 453,930 $4,655 27 $2,212 138 $37,428
453,930
kWh
$4,655
27
kW-months/year
$2,212
138
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas