Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2010 |
Principal Product | Latex Paints |
NAICS | 325510 - Paint and Coating Manufacturing |
SIC | 2851 - Paints And Allied Products |
Sales | $100,000,000-$500,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 178,000 |
Annual Production | 15,000 Thousand Gallons |
Production Hrs. Annual | 6,240 |
Location (State) | DE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $364,447 | 4,935,386 | kWh | $0.07 |
Electricity Demand | $31,085 | 987 | kW-months/year | $31.49 |
Natural Gas | $89,806 | 5,998 | MMBtu | $14.97 |
TOTAL ENERGY COSTS | $485,338 | |||
RECOMMENDED SAVINGS* | $164,820 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $155,174 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,599 Cost: $50 |
$3,599 | 44,436 | - | - |
$3,599 44,436 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE |
Savings: $35,889 Cost: $1,500 |
- | - | $35,889 | 2,399 |
- - kWh |
$35,889 2,399 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $43,192 Cost: $2,000 |
$43,192 | 533,232 | - | - |
$43,192 533,232 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $7,180 Cost: $1,000 |
- | - | $7,180 | 480 |
- - kWh |
$7,180 480 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $17,413 Cost: $2,500 |
- | - | $17,413 | 1,164 |
- - kWh |
$17,413 1,164 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $5,857 Cost: $2,180 |
$5,857 | 72,314 | - | - |
$5,857 72,314 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $51,500 Cost: $30,000 |
$51,500 | 645,000 | - | - |
$51,500 645,000 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY |
Savings: $190 Cost: $435 |
$190 | 2,330 | - | - |
$190 2,330 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $164,820 Cost: $39,665 |
$104,338 | 1,297,312 | $60,482 | 4,043 | $104,338 1,297,312 kWh |
$60,482 4,043 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $155,174 Cost: $37,000 |
$94,692 | 1,178,232 | $60,482 | 4,043 | $94,692 1,178,232 kWh |
$60,482 4,043 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |