IAC logo
IAC Assessment: DL0052
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0052
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2010
Principal Product Polishing products
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2269 - Finishing Plants, Nec
Sales $100,000,000-$500,000,000
# of Employees 650
Plant Area (Sq.Ft.) 6,500
Annual Production 1 Units
Production Hrs. Annual 6,120
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $770,578 6,124,800 kWh $0.13
Natural Gas $547,652 75,921 MMBtu $7.21
TOTAL ENERGY COSTS $1,318,230
RECOMMENDED SAVINGS* $276,712 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,250
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$143,000
Cost:
$81,500
$143,000 1,136,000 - - $143,000
1,136,000
kWh
-
-
MMBtu
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$53,946
Cost:
$10,848
- - $53,946 7,213 -
-
kWh
$53,946
7,213
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,100
Cost:
$24,000
$25,100 200,000 - - $25,100
200,000
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,250
Cost:
$9,000
$15,250 121,065 - - $15,250
121,065
kWh
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$12,940
Cost:
$1,500
$12,940 102,724 - - $12,940
102,724
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,040
Cost:
$720
$11,040 87,600 - - $11,040
87,600
kWh
-
-
MMBtu
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,560
Cost:
$200
$4,560 36,200 - - $4,560
36,200
kWh
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,810
Cost:
$560
$3,810 30,240 - - $3,810
30,240
kWh
-
-
MMBtu
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,650
Cost:
$1,019
$3,650 29,000 - - $3,650
29,000
kWh
-
-
MMBtu
10: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,106
Cost:
$495
$3,106 24,650 - - $3,106
24,650
kWh
-
-
MMBtu
11: 2.7314 REDUCE VENTILATION AIR Savings:
$310
Cost:
$585
$310 2,474 - - $310
2,474
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$276,712
Cost:
$130,427
$222,766 1,769,953 $53,946 7,213 $222,766
1,769,953
kWh
$53,946
7,213
MMBtu
TOTAL IMPLEMENTED Savings:
$51,250
Cost:
$12,999
$51,250 406,829 - - $51,250
406,829
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas