Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2011 |
Principal Product | Recycled press Fiberboard |
NAICS | 322130 - Paperboard Mills |
SIC | 2631 - Paperboard Mills |
Sales | $50,000,000-$100,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 99,999 Units |
Production Hrs. Annual | 8,760 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,199,591 | 44,102,220 | kWh | $0.07 |
Natural Gas | $6,390,893 | 1,089,347 | MMBtu | $5.87 |
LPG | $60,037 | 3,365 | MMBtu | $17.84 |
Fuel Oil #2 | $18,153 | 1,040 | MMBtu | $17.45 |
TOTAL ENERGY COSTS | $9,668,674 | |||
RECOMMENDED SAVINGS* | $552,602 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $77,835 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1224 REPLACE BOILER |
Savings: $123,207 Cost: $900,000 |
- | - | $123,207 | 21,000 |
- - kWh |
$123,207 21,000 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $191,452 Cost: $500,000 |
- | - | $191,452 | 32,632 |
- - kWh |
$191,452 32,632 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $30,553 Cost: $42,800 |
$30,553 | 418,530 | - | - |
$30,553 418,530 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $57,285 Cost: $28,500 |
$57,285 | 784,730 | - | - |
$57,285 784,730 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $33,872 Cost: $165,720 |
$33,872 | 464,000 | - | - |
$33,872 464,000 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $14,637 Cost: $800 |
$14,637 | 200,500 | - | - |
$14,637 200,500 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $77,835 Cost: $42,650 |
$(-4,303) | (-58,950) | $82,138 | 14,000 |
$(-4,303) (-58,950) kWh |
$82,138 14,000 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $23,761 Cost: $22,500 |
- | - | $23,761 | 4,050 |
- - kWh |
$23,761 4,050 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $552,602 Cost: $1,702,970 |
$132,044 | 1,808,810 | $420,558 | 71,682 | $132,044 1,808,810 kWh |
$420,558 71,682 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $77,835 Cost: $42,650 |
$(-4,303) | (-58,950) | $82,138 | 14,000 | $(-4,303) (-58,950) kWh |
$82,138 14,000 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |