IAC logo
IAC Assessment: DL0086
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0086
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2012
Principal Product Metal Cans
NAICS 332431 - Metal Can Manufacturing
SIC 3411 - Metal Cans
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 128,000
Annual Production 83,000,000 Pieces
Production Hrs. Annual 2,200
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,524 1,350,000 kWh $0.09
Electricity Demand $45,375 7,906 kW-months/year $5.74
Natural Gas $57,485 6,981 MMBtu $8.23
TOTAL ENERGY COSTS $230,384
RECOMMENDED SAVINGS* $52,055 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,909
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,400
Cost:
$100
- - $6,400 772 -
-
kWh
$6,400
772
MMBtu
02: 2.2311 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS Savings:
$2,479
Cost:
$500
$2,479 25,300 - - $2,479
25,300
kWh
-
-
MMBtu
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$1,390
Cost:
$280
$980 10,400 $410 50 $980
10,400
kWh
$410
50
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,790
Cost:
$100
$1,790 15,840 - - $1,790
15,840
kWh
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,790
Cost:
$160
$1,790 15,840 - - $1,790
15,840
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,740
Cost:
$3,250
$6,740 59,635 - - $6,740
59,635
kWh
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,250
Cost:
$9,900
$3,250 34,600 - - $3,250
34,600
kWh
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,500
Cost:
$4,000
$3,500 37,800 - - $3,500
37,800
kWh
-
-
MMBtu
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,857
Cost:
$2,500
- - $7,857 957 -
-
kWh
$7,857
957
MMBtu
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$466
Cost:
$3,100
$466 4,127 - - $466
4,127
kWh
-
-
MMBtu
11: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$493
Cost:
$450
$493 4,360 - - $493
4,360
kWh
-
-
MMBtu
12: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,850
Cost:
$10,000
- - $8,850 1,078 -
-
kWh
$8,850
1,078
MMBtu
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,800
Cost:
$9,700
$4,800 44,000 - - $4,800
44,000
kWh
-
-
MMBtu
14: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,250
Cost:
$300
$2,250 19,900 - - $2,250
19,900
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$52,055
Cost:
$44,340
$28,538 271,802 $23,517 2,857 $28,538
271,802
kWh
$23,517
2,857
MMBtu
TOTAL IMPLEMENTED Savings:
$20,909
Cost:
$8,010
$14,509 138,575 $6,400 772 $14,509
138,575
kWh
$6,400
772
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas